Laserfiche WebLink
<br />;. <br /> <br />\' <br /> <br />The costs are only a very broad guess because I was so <br />late in applying for this loan, but I would hope when <br />complete they would not be this high. I installed a new <br />outlet pipe in 1992 at which time the Forest Service stated <br />they would be quite willing to let the dam be increased J <br />but I would have to have an engineer in charge. I can see <br />no reason for not being able to afford the cost. with the ne <br />for water I should have no problem renting any excess r wou d <br />have. I have based the cost on needing seven or eight <br />weeks to raise thed~ and clear the timber from the reservoir. <br /> <br />-- <br /> <br />- -- <br /> <br />- <br /> <br />--- <br /> <br />