My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02095
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ02095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:40 AM
Creation date
7/16/2007 2:47:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0059FX
Contractor Name
Melvin L. Thiebaud
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />;. <br /> <br />\' <br /> <br />The costs are only a very broad guess because I was so <br />late in applying for this loan, but I would hope when <br />complete they would not be this high. I installed a new <br />outlet pipe in 1992 at which time the Forest Service stated <br />they would be quite willing to let the dam be increased J <br />but I would have to have an engineer in charge. I can see <br />no reason for not being able to afford the cost. with the ne <br />for water I should have no problem renting any excess r wou d <br />have. I have based the cost on needing seven or eight <br />weeks to raise thed~ and clear the timber from the reservoir. <br /> <br />-- <br /> <br />- -- <br /> <br />- <br /> <br />--- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.