My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02095
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ02095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:40 AM
Creation date
7/16/2007 2:47:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0059FX
Contractor Name
Melvin L. Thiebaud
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1. <br /> <br />, <br /> <br />CWCB Construction Fund Loan Application <br />Revised January 31, 1994 <br /> <br />4. General location of the project. (Please include county, and approximate distance and <br />direction from nearest town, as well as legal description, if known): <br />J)~Jk...O!hot;- 11 h1/I~ Nil, 1r~J4Y'~ ~Gm:si. <br /> <br />5. Please provide a brief narrative description of the proposed project including purpose, <br />need, facilities, types of water useS to be served and service area. (Attach separate sheet, <br />if needed.):--rtQ. k 1.1.Y~ ;s f ,./ ed f) h to r a.. } S I rill w.. hILi-VI ell P r hu. i I +- To <br />that H-etffht: I+ W tff +ha.+ t; me. bQ~Vl as.ce~ta jf1~d +JUlr if ha4 <br />tl.d.a..~tll'L+e d\^ll:h"rl"' -f()f'JI. ihe l-tJd_t-er w{)uld be LL~(!d. ta- <br />I rV'll~at-i bY, I h ('edaY""dd-~ llt-eLL, <br /> <br />6. Will the acquisition of additional water rights be necessary? <br />YES NO X. If "YES", please explain: <br /> <br />7. Please list the names and addresses of any technical or legal consultants retained to <br />represent the applicant or to conduct investigations for the proposed project: <br /> <br />NAME <br /> <br />ADDRESS and PHONE <br />1), U hp_ h/y-~ <br /> <br />8. List any feasibility studies or other investigations which have been completed or are now <br />in progress for the proposed project. (please submit one copy of each completed study <br />with this application): <br />.st u.oI i~s Were.- made w/' e l1 i t- W tL,S fi r.s: 1- <br />s u..-b m ~ #- e d . <br /> <br />3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.