My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10394 (2)
CWCB
>
Floodplain Documents
>
Backfile
>
10001-11000
>
FLOOD10394 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:41:08 PM
Creation date
7/16/2007 2:16:05 PM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Community
Westminster
Stream Name
Big Dry Creek Update
Title
LOMR - Affected Panel 08059C0089 E, 08059C0093 E - Case No. 04-08-0439P
Date
11/30/2005
Prepared For
Westminster
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2 <br /> <br />South City Park Creek: <br />Approximately 820 feet upstream of <br />confluence with Big Dry Creek <br />Approximately 2,000 feet upstream of <br />confluence with Big Dry Creek <br /> <br />5,292 <br /> <br />None <br /> <br />5,330 <br /> <br />None <br /> <br />South Branch Hylands Creek: <br />At confluence with Big Dry Creek <br />Approximately 140 feet upstream of <br />confluence with Big Dry Creek <br /> <br />5,279 <br /> <br />5,280 <br /> <br />5,280 <br /> <br />5,280 <br /> <br />*National Geodetic Vertical Datum, rounded to nearest whole foot <br /> <br />Under the above-mentioned Acts of 1968 and 1973, the Mitigation Division must develop criteria for <br />floodplain management. To participate in the National Flood Insurance Program (NFIP), the community <br />must use the modified BFEs to administer the floodplain management measures of the NFIP. These <br />modified BFEs will also be used to calculate the appropriate flood insurance premium rates for new <br />buildings and their contents and for the second layer of insurance on existing buildings and contents. <br /> <br />Upon the second publication of notice of these changes in this newspaper, any person has 90 days in <br />which he or she can request, through the Chief Executive Officer of the community, that the Mitigation <br />Division reconsider the determination. Any request for reconsideration must be based on knowledge of <br />changed conditions or new scientific or technical data. All interested parties are on notice that until the <br />90-day period elapses, the Mitigation Division's determination to modify the BFEs may itself be changed. <br /> <br />Any person having knowledge or wishing to comment on these changes should immediately notify: <br /> <br />The Honorable Nancy McNally <br />Mayor, City of Westminster <br />4800 West 92nd Avenue <br />Westminster, CO 80031 <br />
The URL can be used to link to this page
Your browser does not support the video tag.