My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10348 (3)
CWCB
>
Floodplain Documents
>
Backfile
>
10001-11000
>
FLOOD10348 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:41:27 PM
Creation date
7/16/2007 2:09:46 PM
Metadata
Fields
Template:
Floodplain Documents
County
Broomfield
Community
Broomfield
Stream Name
Airport Creek
Title
LOMR - Affected Panel 0020 E - Case No. 02-08-156P
Date
2/26/2003
Prepared For
Adams and Broomfield Counties
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Federal Emergency Management Agency <br />Washington, D.C. 20472 <br /> <br />OCT 29 2002 <br /> <br />CERTIFIED MAIL <br />RETURN RECEIPT REQUESTED <br /> <br />IN REPLY REFER TO: <br />Case No.: 02-08-I56P <br />Community: City and County of <br />Broomfield, CO <br />Community No.: 085073 <br />Panel Affected: 0020 E <br />Effective Date of FEB 2..6 2003 <br />This Revision: <br /> <br />The Honorable Karen Stuart <br />Mayor, City and County of Broomfield <br />One Des Combes Drive <br />Broomfield, CO 80020 <br /> <br />I02-I-A-C <br /> <br />Dear Mayor Stuart: <br /> <br />This responds to a request that the Federal Emergency Management Agency (FEMA) revise the effective <br />Flood Insurance Rate Map (FIRM) and Flood Insurance Study (FIS) report for your community in <br />accordance with Part 65 of the National Flood Insurance Program (NFIP) regulations. In a letter dated <br />February.7,2002, ,P.E., Martin I Martin, requested that FEMA revise the FIRM and <br />FIS report to show the effects of channel modifications along Airport Creek associated with the <br />Broomfie]d Corporate Center development, Phase 1, from Main Street (formerly known as Pierce Street) <br />to approximately 710 feet upstream. The channel modifications included extension ofthe existing twin <br />7-foot by 5-foot concrete box culvert under Main Street, channelization, drop structures, placement of <br />fill, and grading. This request follows up on a Conditional Letter of Map Revision issued on May 24, <br />2001. <br /> <br />All data required to complete our review of this request were submitted with letters from _I <br />-. P.E., Principal, and Senior Designer, both also with Martin I Martin; <br />, Broomfield 1 12th & Main Partners; and I . <br /> <br />We have completed our review ofthe submitted data and the flood data shown on the effective FIRM <br />and in the effective FIS report. We have revised the FIRM and FIS report to modify the elevations and <br />floodplain and floodway boundary delineations of the flood having a I-percent chance of being equaled <br />or exceeded in any given year (base flood) along Airport Creek. As a result of the modifications, the <br />Base Flood Elevations (BFEs) for Airport Creek and the widths of the Special Flood Hazard Area <br />(SFHA), the area that would be inundated by the base flood, and the regulatory floodway increased in <br />some areas and decreased in other areas. The modifications are shown on the enclosed annotated copies <br />of FIRM Panel 0020 E, Profile Panel OIP, and affected portions of the F]oodway Data Table. This Letter <br />of Map Revision (LOMR) hereby revises the above-referenced panel of the effective FIRM and the <br />affected portions ofthe FIS report, both dated September 30, 1997. <br /> <br />The modifications are effective as of the date shown above. The map panel listed above and as modified <br />by this letter will be used for all flood insurance policies and renewals issued for your community. <br />
The URL can be used to link to this page
Your browser does not support the video tag.