Laserfiche WebLink
<br /> <br />Federal Emergency Management Agency <br />Washington, D.C. 20472 <br /> <br />CERTIFIED MAIL <br />RETURN RECEIPT REQUESTED <br /> <br />IN REPLY REFER TO: <br />Case No.: 01-08-353P <br /> <br />The Honorable Marty Flaum <br />Chairperson, Adams County <br />Board of Commissioners <br />450 South Fourth Avenue <br />Brighton, CO 80601 <br /> <br />Community: Adams County, CO <br />Community No.: 080001 <br />Panel Affected: 08001C0030 G <br />E~ective.~ate of SEP 25 2001 <br />ThIS ReVISIon: <br /> <br />102-I-C <br /> <br />Dear Mr. Flaum: <br /> <br />This responds to a request that the Federal Emergency Management Agency (FEMA) revise the <br />effective Flood Insurance Rate Map (FIRM) for Adams County, Colorado and Incorporated Areas (the <br />effective FIRM for your community), in accordance with Part 65 of the National Flood Insurance <br />Program (NFIP) regulations. In a letter dated August 7,2001, , P.E., Gillans, Inc., <br />requested that FEMA revise the FIRM to show the effects of construction of The Haven at York <br />subdivision project along South Wadley Creek. The project included construction of a culvert at York <br />Street, realignment of South Wadley Creek, and channelization from its confluence with Big Dry Creek <br />to the Union Pacific Railroad. This request follows up on a Conditional Letter of Map Revision issued <br />on November 27,2000. <br /> <br />All data required to complete our review of this request were submitted with letters from. <br /> <br />. .. . <br /> <br />We have completed our review of the submitted data and the flood data shown on the effective FIRM. <br />We have revised the FIRM to modifY the floodplain boundary delineations of the flood having a <br />I-percent chance of being equaled or exceeded in any given year (base flood) along South Wadley <br />Creek from Big Dry Creek to the Union Pacific Railroad. As a result of the modifications, the width of <br />the Special Flood Hazard Area (SFHA), the area that would be inundated by the base flood, for South <br />Wadley Creek increased in some areas and decreased in other areas. The base flood is contained within <br />the engineered channel along the revised reach. In addition, all increases in SFHA are contained within <br />a drainage easement owned by the City of Thornton. The modifications are shown on the enclosed <br />annotated copy of FIRM Panel 08001C0030 G. This Letter of Map Revision (LOMR) hereby revises <br />the above-referenced panel of the effective FIRM dated August 16, 1995. <br /> <br />Because this revision request also affects areas of the City of Thornton, a separate LOMR for that <br />community was issued on the same date as this LOMR. <br /> <br />The modifications are effective as of the date shown above. The map panel as listed above and as <br />modified by this letter will be used for all flood insurance policies and renewals issued for your <br />community. <br />