Laserfiche WebLink
Frank L. Novak, P.E. <br />Consulting Engineer <br />,�larining and Design 3218 Lakc Park Way <br />�ecial Investigatrons Longmont, CO 80503 <br />Co�lstructiorT Managentent (303) 678-5507 <br />December 18, 2001 <br />Mr. Gary D. Clements, President <br />Pinewood Springs Water District <br />183 Cree Court <br />Lyons, Colorado 80540 <br />Re: Feasibility Study for Alternate Water Supply Sources <br />Dear Mr. Clements, <br />In accordance with our earlier discussions, it is my understanding that the <br />Pinewood Springs Water District requests that I perform a feasibility study to <br />evaluate alternate sources of water supply to augment the cunent supply from <br />the Little Thompson River. <br />Such alternate sources to be ultimately evaluated would include the construc- <br />� tion of a reservoir, or reservoirs, for storage, as well as raw water transmis- <br />sion sytems. <br />Currently being considered is an initial effort directed toward evaluating <br />alternative methods to enlarge the volume of Crescent Lake, either by broad- <br />ening its surface area, or deepening it, or a combination of both. <br />In this regard, I propose to conduct the following work for the estimated cost <br />as shown. <br />A) Broadenin� the Surface Area of Crescent Lake <br />Analysis of available topographic data to determine the optimum extent of <br />expanding the surface area of the lake, supplemented with actual field surveys <br />to confirm specific critical elevations, and to identify adjoining property <br />boundary locations-- ---- ------------------------------------------------------$5000 <br />Identification of additional land to be acquired to accommodate surface expan- <br />sion and determination of the degree of its availability and cost-----------$3000 <br />� Preliminary design and related construction cost estimate-----------------$4000 <br />