Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />t <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />. <br />. <br />. <br />t <br />. <br />. <br />~ <br />~ <br />~ <br />. <br /> <br />Cost Estimate <br /> <br />The estimated cost of the project is $740,000. Table 2 provided a detailed Engineer's Opinion of Costs <br />by item. <br /> <br />Table 2 <br />Empire Dam Rehabilitation <br />Engineer's Opinion of Cost <br /> <br /> Unit <br />Item Description Unit Quantitl' Cost Extension <br />1 Mobilization (Equip. Mob., bonding, insurance, 5%) LS 1 $25,000 $25,000 <br />2 Clearing and Grubbing LS 1 $5,000 $5,000 <br />3 Earthwork CY 800 $10 $8,000 <br />4 6" Toe drain pipe installation LF 1630 $28 $45,640 <br />5 8" Toe drain pipe installation LF 2740 $32 $87,680 <br />6 Concrete CY 300 $550 $165,000 <br />7 Riprap CY 1038 $65 $67,470 <br />8 Riprap-bedding CY 346 $25 $8,650 <br />9 Parshall Flumes EA 2 $17,000 $34,000 <br />10 Reinforced Concrete Pipe LF 120 $60 $7,200 <br />11 Inspection Manholes EA 10 $4,000 $40,000 <br />12 Cleanouts EA 5 $1,000 $5,000 <br />13 Buoy System EA 6 $960 $5,760 <br />14 Road Base LF 850 $20 $17,000 <br />15 Topsoil and Seeding AC 2 $2,000 $4,000 <br /> Subtotal Construction Cost $524,840 <br /> Contingency ~ 20% $104,968 <br /> Direct Construction Cost $629,808 <br /> Engineering and Administrative $110,000 <br /> Total Cost to nearest $10,000 $740,000 <br /> <br />Implementation Schedule <br /> <br />The following schedule is proposed for the implementation of the project. <br /> <br />Item Task Target Completion Date <br />1 Feasibility Study April 30, 2005 <br />2 Loan from CWCB July 31, 2005 <br />3 Spillway Construction December 31, 2005 <br />4 Toe Drain Construction December 31, 2005 <br /> <br />The toe drain improvements are scheduled to be constructed during low water at the reservoir. This <br />occurs late in the irrigation season. The toe drain improvements would likely be installed in late October. <br /> <br />Feasibility Study <br />Empire Reservoir Spillway Construction <br /> <br />- 3 - <br /> <br />June 2005 <br /> <br />F:\4763 _00 I \Feasibility Study\Feasibility)ilUdy.rpLdoc <br />