My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02089
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2011 3:38:46 PM
Creation date
7/13/2007 7:27:38 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150199
Contractor Name
Bijou Irrigation District
Contract Type
Loan
Water District
1
County
Morgan
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />· PM BIJOU IRRIGATION <br />~MAR-28-2005 02:14 <br /> <br />'370 86722'34 <br /> <br />P.03 <br /> <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />Pas_ (2) <br /> <br />pISTRICT POLICIES AND RESOLUTIONS (continued) <br /> <br />A-7 (8/13/84) Operating procedures for river diversion dam.. <br /> <br />... .... . .... . ".-. . . -.------------"'----. ...... ------... ..--........-..---- <br /> <br />August 13, 198q. <br /> <br />SUBJECrl OPERATION INSTRUCTIONS Of RIVER DIVDlSION DAMS. <br /> <br />REfERENCEs EI1PlRE RESEUVOrn INrAKE l>lVERSION DAM AND UIJOU CANAL INIAKE <br />DIVEnSION DAM. <br /> <br />TO. ALL EMPLOYEES AND OPEHATOOS Of AaOVE NAMED SlRUCTLnES. <br /> <br />1. As these structures were not designed to be used as roU-o\l(~r <br />dams and should not be used as suoh, except dUring r load st.JUCS <br />of the river, when there may be a large nmount of trees and <br />other debr15 in the water that might lodge in the open vents. <br /> <br />2. The Bljou Irrigation District's, Empire diversion dam should be <br />operated so that when there is no water beIng delivered to t.lle <br />reservoIr in the Summer months, the vents shall be opened to <br />allow the river water to clear the sand and gravel away from <br />the intake canal headgates and upstream of the dam itself. <br /> <br />J. The 81j~u Irrigation Company's, Bijou Canal intake callal <br />dIversion Shall be operated so that when water delivery to <br />farms stop:l In the fall, the flood roller gate and ..adlal <br />gate In the river shall be closed and the vents opened to <br />allow the water to wash the sand and gravel thru so as to <br />keep the river channel above the dam open. These vents to <br />remain open until water deHvery again starts in the SprIng <br />or the threat of flooding appears. <br /> <br />These orders and In8tru~tlons were initiated by the Board of Directors of <br />The EHJou Irrigation Company and the Board of Directors of The 81jot) <br />Irrlg;tt:!on District at a Special Joint Directors meeting held on th(:! <br />13th day of August, A. D., 1984 and the Seoretary was instructed to <br />spread them In the minutes respectively. <br /> <br />Uoard of Directors, <br />The Bijou Irrigation Co. <br />The Bljou Irrigation l>lst. <br /> <br />The Bljou Irrigation Di.triat - I The BiJoU Irrigation Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.