My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02087
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 9:50:10 AM
Creation date
7/12/2007 8:29:27 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150129
Contractor Name
South Side Ditch Company
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Project Five: <br /> <br />DITCH ASSESSmlLITY VIA DITCH BANK <br /> <br />The purpose of this project is to provide a means to traverse the ditch for improved maintenance and <br />operations. The improvement of the ditch bank access road will enable better inspection and operation of <br />the ditch and improve the ability \0 deliver water \0 their users. <br /> <br />Two alternative were considered: <br /> <br />I. Leave as is. <br />2. Upgrade the ditch bank access road to provide better maintenance and operation of the ditch system. <br /> <br />The South Side Ditch Company has developed the preliminary cost estimates for the project. The cost <br />estimates are based on machinery hourly cost and are swnmarized in Table 5. <br /> <br />Table 5. Ditch Bank Roadway and Ditch Rehabilitation <br /> <br />Cost of Project: 148 hours equipment cost @ $135 per hour <br /> <br />$19,980 <br /> <br /> <br />Example of Ditch Bank Condition <br /> <br />Page 12 <br /> <br />South Side Ditch Company <br />Feasibility Study <br />2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.