Laserfiche WebLink
<br />Project Five: <br /> <br />DITCH ASSESSmlLITY VIA DITCH BANK <br /> <br />The purpose of this project is to provide a means to traverse the ditch for improved maintenance and <br />operations. The improvement of the ditch bank access road will enable better inspection and operation of <br />the ditch and improve the ability \0 deliver water \0 their users. <br /> <br />Two alternative were considered: <br /> <br />I. Leave as is. <br />2. Upgrade the ditch bank access road to provide better maintenance and operation of the ditch system. <br /> <br />The South Side Ditch Company has developed the preliminary cost estimates for the project. The cost <br />estimates are based on machinery hourly cost and are swnmarized in Table 5. <br /> <br />Table 5. Ditch Bank Roadway and Ditch Rehabilitation <br /> <br />Cost of Project: 148 hours equipment cost @ $135 per hour <br /> <br />$19,980 <br /> <br /> <br />Example of Ditch Bank Condition <br /> <br />Page 12 <br /> <br />South Side Ditch Company <br />Feasibility Study <br />2003 <br />