My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02087
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 9:50:10 AM
Creation date
7/12/2007 8:29:27 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150129
Contractor Name
South Side Ditch Company
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Project Three: <br /> <br />HYDRAULIC CHECK STRUCTURE # 27 Yo <br /> <br />~P.!!tce hydraulic check structure know as check # 27 Y, on the South Side Ditch at marker 33. <br /> <br /> <br />Photo of check structure 27 Yo <br /> <br />Two alternatives were considered: <br /> <br />I. Continue to use the existing unserviceable structure. <br />2. Replace the check structure. <br /> <br />The South Side Ditch Company has developed the preliminary cost estimate using the United States <br />Department of Interior, Bureau of Reclamation "Quantity Estimate for Irrigation Structures" for use in <br />preparation offeasibility estimates. The cost breakdown is summarized in Table 3. <br /> <br />Table 3. Check Structure Number 27 1/2 <br /> <br />Cost of Project: Replace structure <br /> <br />$3,150 <br /> <br />Page 10 <br /> <br />South Side Ditch Company <br />Feasibility Study <br />2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.