My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02086
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ02086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 9:50:10 AM
Creation date
7/12/2007 8:29:26 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150129
Contractor Name
South Side Ditch Company
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br /> <br />6. Will the acquisition of additional water rights be necessary? YES _ NO...x <br />If YES, please explain. <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attomey(s). <br />NAMF ADDRESS :mrl PHONE <br /> <br />Tohn G Cr.mthiere P F <br />, <br /> <br />7.1 '57 Rllen::! Vi~t::! Drive, Greeley ro ROh14, (970) 110-OR'5'5 <br />1 'i0 E ?91b St Snitp. 78'i PO Rox 64? l.ovp.l;mrl ('0 RO'\19-0064? <br />.. .. .. <br /> <br />R::!nrlolph W St::!IT, P r <br /> <br />(970) 676-1029 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in progress <br />for the proposed project. Please submit one copy of each completed study with this application. <br /> <br />(None) <br /> <br />9. Estimated cost of the project. Please include estimated engmeenng costs, and estimated <br />construction costs, ifknown. <br /> <br />Estimated Engineering Costs:$ 10 000 rle~ien plll~ eon~tm~tion m::!n::!eement <br /> <br />Estimated Construction Costs: <br />Estimated Total Costs: <br /> <br />$ <br />$ <br /> <br />70 000 <br />, <br /> <br />RO,OOO(~ontin~nt on ollt~ome ofFf".a~ihility Sturly) <br /> <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $ n ,000 <br /> <br />(UsWllly 75% of Estimated Total Costs) <br /> <br />Term (length) ofloan: <br />Interest Rate: <br /> <br />10 <br />7. 7'\ <br /> <br />Yf".ar~ (Usually 10,20, or 30 years) <br /> <br />%, (Please call for our current rates) <br /> <br />Part C. - Project Sponsor Financial Information <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following information is <br />needed to assist the CWCB in a preliminary assessment of the applicant's financial capacity. It is also <br />requested that the project sponsor submit with this application copies of the two most recent annual <br />reports, financial statements, corporate reports or other current documentation of financial condition <br />and operations. <br /> <br />1. List any existing liability or indebtedness that exceeds one thousand dollars. For example, bank <br />loans, government agency loans, bond issues, accounts payable, etc. Include names and addresses <br />oflenders, amounts, due dates and maturity dates. Attach a separate schedule, if needed. <br /> <br />1 <br /> <br />CFLA602 <br />
The URL can be used to link to this page
Your browser does not support the video tag.