Laserfiche WebLink
<br />. <br />JAN-20-2004 TUE 12:09 PM AQUA ENGINEERING INC <br />I . <br /> <br />FAX NO, 9702263855 <br /> <br />P. 10/12 <br /> <br />~ <," <br /> <br />CWC.!;! Construction Fund Loan AppJication <br /> <br />4. Please provide a brief description of the owner's existing water supply facilities and describe <br /> <br />nny existing operational or maintenance problems. Attach separate sheets ifnccdcd, and a map <br />. <br />(~fthe service area. See water application filed in Di"Vt3Ion No. 1 under Case No. <br />2003 CW 404. <br /> <br />For existing facilities indicate: <br />Number of shareholders 57 <br /> <br />or Number of customers serveu <br />Number of shares 250 <br /> <br />Current Assessment per share $ 225. QO <br />Number of aCres irrigated _ <br /> <br />Part B. - Description of the Project <br />1. Name of the project or facility recharge pond on property of Nancy Mercure <br /> <br />2. Purpose of this loan application. Check one. <br />X New project <br />Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br />Other ( describe) <br /> <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br />storage restriction order from the State Engineer'? YES _ NO ~ <br /> <br />4. General location ofthc project. (please include county, and approximate distance and direction <br />from nearest town. as well as legal dcscription, if known. SE 1/4 NW 1/4 of Sec l;. f>~ Twp. <br />4 N., Rug. 61 w. of the 6th P.M..~ nearest town is LaSalle, Colorado <br /> <br />5. Please provide a brief narrative description of the proposed project including purpose, nced, <br />facilities, type of water uses to be served and service area. Attach separate sheet, if needed. _ <br />~~recharge pond is goin~ to be constructed to run water into7which then <br /> <br />seeps into the aquifer. The time delay between the recharge pond and the <br /> <br />South Platte River will provide water to the river to help offset depletions <br />caused by the pumplng ot lrrlgatlon weiis under the Unlon Dltch co. augmentation plan <br />Water Right: CFS. Average water diverted per year; acre-feet. <br /> <br />6. Will the acquisilionofadditional water rights be necessary? YES -.lL.. NO <br />Union Ditch Col is currently filing an application on a junior water right <br />to be used in this recharge pond and is exploring the purchase of Union Ditch <br />Co. share(s) to be used in its augmentation plan. <br /> <br />2 <br /> <br />CFLJ\902 <br />