My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02080
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ02080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2011 3:19:43 PM
Creation date
7/11/2007 2:59:56 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150218
Contractor Name
Hope Ditch Company
Contract Type
Loan
Water District
1
County
Adams
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Hope Ditch Company <br />January 24-25, 2005 <br /> <br />Agenda Item 18a <br /> <br />As security for the loan, the HOC will pledge its monthly and special capital water assessment <br />revenue backed by a rate covenant, and the replacement well, along with the land parcel where the <br />well is located and all related appurtenances. The well, pump house and storage tanks are <br />located on a parcel of land (60 ft. x 145 ft.) deeded to HOC in 1993. This is in compliance with <br />CWCB Loan Policy #5 (Collateral). <br /> <br />Recommendation <br /> <br />Staff recommends a loan not to exceed $154,530 ($153,0000 for project costs and $1,530 for the 1 % <br />Loan Service Fee in accordance with CWCB Loan Policy #16), to the Hope Ditch Company from the <br />Construction Fund, to replace an existing well for domestic water supply. The recommended terms of <br />the loan are 30 years at 3.75% per annum. Security for the loan will be a pledge of monthly and capital <br />water assessment revenue, backed by a rate covenant, and the replacement well, along with the land <br />parcel where the well is located and all related appurtenances. <br /> <br />Staff further recommends that final approval of the loan be conditioned upon all other standard <br />contracting provisions of the CWCB, with the following additional condition: <br /> <br />In the event that the Hope Ditch Company should amend Article VIII, Section 7.7 of its By- <br />Laws, removing the Company's ability to file liens and foreclose on lots for delinquent <br />assessments, the CWCB loan shall become due and payable in full. <br /> <br />cc: Dave Force, Treasurer, Hope Ditch Company <br />Amy Stengel, AGO <br /> <br />Attachment <br /> <br />Action Taken bv the CWCB on January 25. 2006 <br />The CWCB approved the Staff Recommendation. <br /> <br />Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.