My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02078
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ02078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2010 10:03:59 AM
Creation date
7/11/2007 1:58:27 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150011
Contractor Name
Consolidated Mutual Water Company, The
Contract Type
Loan
Water District
7
County
Jefferson
Bill Number
SB 99-173
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />". <br /> <br />It,,, <br /> <br />CWCB Construction Fund Loan Application <br /> <br />Fonn Revised March 4, 1998 <br /> <br />8. <br /> <br />9. <br /> <br />List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. (Please submit one copy of each completed study with <br />this application): REFER TO FEASIBILITY STUDY <br /> <br />What is the estimated cost of the project? Please include estimated Engineering costs, and <br />estimated Construction costs, if known: <br />Estimated Engineering Costs: <br />Estimated Construction Costs: <br /> <br />Estimated Total Costs: <br /> <br />$ <br />$ <br />$ <br /> <br />SEE ATTACHED EXHIBIT LABELED: <br />LOAN APPLICATION - ITEM #9 <br /> <br />10. <br /> <br />What loan amount and terms are you requesting? <br />completing this section): <br />Requested Loan Amount: <br />Term (length) of loan: <br />Interest Rate: <br /> <br />(Please call for our current rates before <br /> <br />$ 10.000.000 <br />10 .:. years <br />4.75 % <br /> <br />(Usually 75 % of Estimated Total Costs) <br /> <br />(Usually 10,20, or 30 years) <br /> <br />Part C. - Project Sponsor Financial Information <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project <br />sponsor have the fmancial capacity to repay any loans made by the CWCB. The following <br />information is requested to assist the CWCB in a preliminary assessment of the applicant's <br />fmancial capacity. It is also requested that the project sponsor submit with this application copies <br />of the two most recent annual reports, financial statements, corporate reports or other current <br />documentation of financial condition and operations. REFER TO FEASIBILITY STUDY <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.