Laserfiche WebLink
<br /> COLORADO WA TER CONSERVA TION BOARD <br /> FORTUNE RESERVOIR. LOAN CONTRACT C160011 <br /> AS OFMAY31, 2001 <br />Land, EngIneerIng, OrIgInal RevIsed <br />PIpeline & ReservoIr Costs Est/mated Cost EstImated Cost Variance Comments <br />Land & Easements $ 3,285,000 $ 3,285,000 <br />Water Rights Decree 10,000 10,000 <br />Project Management 100,000 100,000 <br />Engineering 300,000 1,200,000 $ 900,000 <br />24 Inch Pipeline 3,850,000 <br />30 Inch Pipeline 650,000 <br />Highway 72 Pipeline 750,000 <br />Fairmount InfraStructure 250,000 <br />Subtotal Pipeline Construction 3,000,000 5,500,000 2,600,000 <br />Dam & Reservoir (R.E. Monks) '" 14,962,470 <br />Contract Overruns. Monks <br />Downstream Toe Excavation 33,000 <br />Keyway Excavation 12,000 <br />Foundation Grouting 287,000 <br />30" Steel Outlet Works Installation 8,000 <br />Additional Storage. On Site Waste 145,000 <br />Upstream Dam Face RipRap 300,000 <br />Subtotal Dam & Reservoir. Monks 15,747,470 <br />Dam & Reservoir. Other <br />Construction Water 150,000 <br />Phase I . SH 72 Shoulder Widening 466,000 <br />Access Road from Indiana Street 41,000 <br />30" Outlet Works Pipe & Vault 186,000 <br />Additional Storage. Off Site Waste 950,000 <br />Xcel Gas Pipeline Relocation 367,000 <br />State Hwy 72 Access 90,000 <br />Subtotal Dam & Reservoir - Other 2,250,000 <br />Dam & Reservoir. Monks & Other 15,062,852 $ 17,997,470 2,9311,618 <br />Total $ 21,757,852 $ 27,982,470 $ 6,224,618 <br />* Includes C.O. ~ #1 Thru #16 Estimated Cost Per AF (Based upon 9,700 AF) I $ 2,885 <br />