My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02075
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 3:12:36 PM
Creation date
7/11/2007 1:41:20 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150222
Contractor Name
Orchard Mesa Irrigation District
Contract Type
Loan
Water District
72
County
Mesa
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />." <br /> <br />. ' <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CWCB Construction Fund Loan Application <br /> <br />4. Please provide a brief description of the owner's existing water supply facilities and describe any <br />existing operational or maintenance problems. Attach separate sheets if needed, and a map of the <br />service area. See attached. Addendum fJ1 <br /> <br />For existing facilities indicate: <br /> <br />Number of shareholders <br />acre <br />Current Assessment per SIWi\$ 60/80 <br /> <br />Number of acres irrigated 9206 <br /> <br />or Number of customers serveti '),040 <br />Number of shares <br />Water Right: 460 CFS. <br /> <br />Average water diverted per year: 58 . 323 acre-feet. <br /> <br />Part B. - Description of the Project <br />1. Name of the project or facility Stokes Gulch Siphon Replac.ement <br /> <br />2. Purpose of this loan application. Check one. <br />New project <br />Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br />Other (describe) <br /> <br />x <br /> <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a storage <br />restriction order from the State Engineer? YES _ NO_ <br /> <br />4. Generailocation of the project. (please include county, and approximate distance and direction <br />from nearest town, as well as legal description, ifknown. Located at the intersection <br />of Rapid Creek Road and Highway 24. two miles east of Palisade.Co in Mesa County <br /> <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water uses to be served and service area. Attach separate sheet, if needed. <br /> <br />See attached Addendum #1 <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.