Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />RED MESA RESERVOIR ENLARGEMENT <br />STATUS and CONCLUDING REPORT <br /> <br />TABLE OF CONTENTS <br /> <br />CHAPTER <br />Summary of Findings <br /> <br />1.0 Introduction <br />2.0 Study Objective - Purpose and Needs <br />3.0 Red Mesa Ward Reservoir and Ditch Company <br />4.0 Previous Studies <br />5.0 Study Area Description <br />6.0 Water Demands <br />7.0 Project Lands <br />8.0 Hydrology and Water Rights <br />9.0 Water Quality <br />10.0 Field Investigations <br />11.0 Evaluation of Alternatives <br />11.1 Repair Alternative <br />11.2 Enlargement Alternative <br />12.0 Description of Selected Plan <br />12.1 Inlet Ditch <br />12.2 Outlet Works <br />12.3 Spillway <br />12.4 Embankment <br />12.5 Land and Rights <br />12.6 Permitting <br />12.7 Project Costs <br />12.8 Implementation Schedule <br />12.9 Financing Plan <br />12.10 Wetlands <br />12.11 River Basin Depletion <br />13.0 Conclusions and Recommendations <br /> <br />PAGE <br />1 - 2 <br /> <br />3 <br />3 <br />6 <br />8 <br />9 <br />10 <br />12 <br />12 <br />18 <br />18 <br />19 <br /> <br />21 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />26 <br />26 <br />27 <br />28 <br />28 <br />32 <br />