My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02071
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:40 AM
Creation date
7/11/2007 1:00:45 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153686
Contractor Name
Red Mesa Ward Reservoir and Ditch Company
Contract Type
Grant
Water District
0
Bill Number
HB 95-1155
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department o/Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />~ <br /> <br />December 17, 1999 <br /> <br />Bill Owens <br />Governor <br /> <br />Mr. Trent J. Taylor <br />Vice President <br />Redmesa Ward Reservoir and Ditch Company <br />1290 County Road 102 <br />Hesperus, CO 81326 <br /> <br />Greg E.Walcher <br />Executive Director <br /> <br />Peter H. Evans <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br />Re: Redmesa Ward Reservoir - Loan Deauthorization Review and Change in Authorization <br /> <br />Dear Mr. Taylor: <br /> <br />At the November 22, 1999 Board meeting, the Board reviewed the status of the Redmesa Ward <br />Reservoirproject and the feasibility study for the project. It was the decision of the Board that <br />that the project, as authorized in HB 95-1155, not be deauthorized and that the Board and the <br />CWCB staff review the project authorization again in one year. The Board also decided that the <br />issue of repayment of the feasibility study loan contract be deferred for one year to allow <br />completion of the study and a determination of project feasibility. <br /> <br />It is expected that a final version of the feasibility study report will be submitted to CWCB staff <br />no later than September 30, 2000. Please continue to coordinate with Bill Green on the study and <br />the feasibility issues. <br /> <br />At the same Board meeting, the Board also recommended that HB 95-1155 be amended to <br />identify the Redmesa Ward Reservoir and Ditch Company as the project sponsor for the Redmesa <br />Ward Reservoir Rehabilitation and Enlargement. The amendment will clarify the authorization <br />and revise the spelling of Redmesa to correspond with the Company's articles of incorporation. <br /> <br />Please let us know if you have any questions or if we can be of assistance. <br /> <br />~Si:,~~ r ~ <br />-~J~/ <br /> <br />Michael G. Serlet, P .E. <br />Chief, Project Planning and Construction Section <br /> <br />Cc: Donald Schwindt, Board Member <br />Peter Evans <br />Dan McAuliffe <br />Bill Green V <br />Linda Bassi, AGO <br />Steve Harris, Harris Water Engr. <br />
The URL can be used to link to this page
Your browser does not support the video tag.