My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02071
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:40 AM
Creation date
7/11/2007 1:00:45 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153686
Contractor Name
Red Mesa Ward Reservoir and Ditch Company
Contract Type
Grant
Water District
0
Bill Number
HB 95-1155
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />authorized in HB 95-1155, not be de authorized at the present time and that the Board and the <br />staff review the status of the project again in one year. <br /> <br />j. City of Victor - Rehab. Victor Dam No.2 - In January 1995, the Board approved a <br />Construction Fund loan of $600,000 to the City of Victor for the rehabilitation of Victor Dam <br />No.2. The project was subsequently authorized in HB 95-1155. Conditions of Board approval <br />included a completed feasibility study and a staff analysis of the City's financial capacity. Icon <br />Engineering, the City's engineering consultant, is presently completing a feasibility study <br />update to be submitted this month. Staff will conduct an analysis: of the City's financial <br />capacity after completion of the feasibility study. Please see Attachment J. . <br />Staff Recommendation - Staff recommends that the Victor Dam No.2 project, as authorized in <br />HB 95-1155, not be de authorized and that the Board and the staff review the status of the <br />project again in one year . <br /> <br />k. Town of Minturn - Bolts Lake Dam and Ditch Rehab. - A Construction Fund loan of <br />$360,000 to the Town of Minturn for the purchase and rehabilitation of Bolts Lake as a <br />municipal raw water reservoir was authorized in SB 96-153. The Town has encountered <br />unforeseen problems with water rights litigation and property acquisition. Please see <br />Attachment K. <br />Staff Recommendation - Staff recommends that the Bolts Lake project not. be deauthorized at <br />the present time and that the Board and the staff review the status 0f the project again in one <br />year. <br /> <br />A copy of this memorandum with the appropriate attachment has been sent to each of the <br />project sponsors (or potential project sponsors) and each has been contacted by phone <br />regarding the November 22-23 Board meeting. <br /> <br />Cc: Linda Bassi, AGO <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.