Laserfiche WebLink
<br />------------------- <br /> <br />SEITII.SIX <br /> <br />Evaluation of AhernativesT <br /> <br />Table 4.1: Engineer's Construction Cost Estimate, Replacement-In-Kind <br /> <br />ITEM NO. ITEM DESCRIPTION . QUANTITY UNIT UNIT PRICE TOTAL PRICE <br />.' .... .' <br />1 Mobilization and Preparatory Work 1 L.S. $55,000.00 <br />2 Site Clearing 0.5 AC $3,500.00 $1,750.00 <br />3 Stripping and Stockpiling Topsoil 300 C.Y. $6.00 $1,800.00 <br />4 Stream Diversion and Dewatering 1 L.S. $40,000.00 <br />5 Sediment and Erosion Control 1 L.S. $10,000.00 <br />6 Excavation and Stockpile Existing Riprap 660 C.Y. $12.00 $4,920.00 <br />7 Open-Cut Excavation 9600 C.Y. $15.00 $144,000.00 <br />8 Remove Existing 18-inch Outlet Works Pipe and 1 L.S. <br />Associative Structures <br />9 Borrow and Place Embankment 9970 C.Y. $10.00 $99,700.00 <br />10 Furnish and Place Filter/Drain Sand 295 C.Y. $50.00 $14,750.00 <br />11 Furnish and Place Drains 20 L.F. $100.00 $2,000.00 <br />12 Borrow and Place Riprap 660 C.Y. $20.00 $13,200.00 <br />13 Furnish and Place Riprap Bedding 120 C.Y. $50.00 $6,000.00 <br />14 Furnish and Place Mud Slab 10 C.Y. $250.00 $2,500.00 <br />15 Furnish and Place Concrete Encasement of 24-inch 60 C.Y. $700.00 $42,000.00 <br />Steel Pipe <br />16 Furnish and Place 24-inch Steel Pipe 190 L.F. $400.00 $76,000.00 <br />17 Furnish and Place Concrete Intake Structure 9 C.Y. $1,000.00 $9,000.00 <br />18 Furnish and Place 18" Slide Gate 1 EA $9,000.00 $9,000.00 <br />19 Furnish and Place Concrete Stem and Headwall and 20 C.Y. $900.00 $18,000.00 <br />Stem Supports <br />20 Furnish and Place Trashrack 1 EA $5,000.00 $5,000.00 <br /> <br />T:IPROJECTS\22238900_MCELROY_DAMlCWCB LOAN FEASIBILITY REPORT DRAFT.DOCI11-OCT-06\2223890010EN 6-1 <br />