My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02064
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ02064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2011 9:33:00 AM
Creation date
7/11/2007 10:00:34 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150234
Contractor Name
Headgate 396 Lateral Corporation
Contract Type
Loan
Water District
72
County
Mesa
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />. <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natura} Resources <br />1313 Sherman Street, Room 721 <br />Denver. Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />November 14,2006 <br /> <br />Bill Owens <br />Governor <br /> <br />Dave McDonald, President <br />Headgate 396 Lateral Corporation <br />2125 IlI2 Road <br />Grand Junction, CO 81505 <br /> <br />Russell George <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />RE: 396 Lateral Piping Project <br /> <br />Dear Mr. McDonald: <br /> <br />I am pleased to inform you that on November 13,2006 the Colorado Water Conservation Board <br />(CWCB) approved your loan request. We understand that the loan will be used to pay for the <br />installation of pipe in the 396 Lateral ditch alignment. <br /> <br />The Board approved an initial loan not to exceed $232,300 ($230,000 for project costs and $2,300 for <br />the 1 % Loan SerVice Fee). The Board also approved a post-construction loan not to exceed $136,300 <br />($134,000 for the remaining balance of construction costs and $2,300 for the 1 % Loan Service Fee) <br />with loan terms of2.5% per annum for 30 years. I have attached a copy ofthe updated Board memo <br />that includes the Board's approval of the Staff Recommendations. <br /> <br />When the Board approves a loan there remain several conditions: <br /> <br />a) Feasibility Study: Kirk Russell has reviewed the study titled "Feasibility Study of <br />Piping Lateral 396, August 2006". Modifications maybe requested by Mr. Russell via <br />phone/fax or email in the next couple days. The approved study, in combination with the <br />CWCB Board Memo revised November 14, 2006, will meet the requirements of the <br />CWCB Construction Fund Guidelines for loan feasibility studies, <br /> <br />b) Contracting: An approved contract must be in place before funds can be advanced. <br />Vaughn McWilliams will initiate the loan contracting process for this proj ect. Once the <br />contract is finalized the Company may request loan funds to cover eligible project <br />expenses, You can contact Vaughn at (303) 866.3462 regarding the requirements. <br /> <br />c) Design/Construction: You must adhere to the CWCB Design and Construction <br />Administration Procedures. Tim Feehan will contact you regarding the requirements <br />concerning construction. Tim will make construction site visits, which will be the basis <br />of pay estimates for disbursement of your loan funds, You can contact Tim at his office <br />at (303) 866.3480 or cell phone (303) 618.5010, <br /> <br />Flood Protection · Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.