My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02063
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2011 9:33:00 AM
Creation date
7/11/2007 10:00:25 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150234
Contractor Name
Headgate 396 Lateral Corporation
Contract Type
Loan
Water District
72
County
Mesa
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />E ""'1' <br /> <br />CWCB Construction Fund Loan Application <br /> <br />6. Will the acquisition of additional water rights be necessary? YES <br />If YES, please explain. <br /> <br />NO X. <br /> <br />7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and <br /> <br />attomey(s). <br />NAME ADDRESS and PHONE <br />Lo~/s. t lI~v+b4V~ NiLS 7Lf3 H~r"'L4..j e+. <br /> <br />q70 - '242 - 4 S"/ J <br /> <br />'C I ~o..( <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. <br />W eA../c~ ~ i:I /("J , P k~A:. " v 1 <br /> <br /> <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, ifknown. <br /> <br />Estimated Engineering Costs:$_ <br /> <br />Estimated Construction Costs: <br />Estimated Other Costs: <br />Estimated Total Costs: <br /> <br />$ 2.20/7091 43 <br /> <br />$ (land acquisition, water rights ~,etc.) <br />$ 2. Z.OJ 701. '13 <br /> <br />, <br /> <br />10. Loan amount and tenns you are requesting. <br />Requested Loan Amount: $ <br /> <br />(Usually 75.90 % of Est Total Costs) <br /> <br />Tenn (length) ofloan: <br />Interest Rate: <br /> <br />~D <br />2.S <br /> <br />% (please call for our current rates) <br /> <br />years (Usually 10,20, or 30 years) <br /> <br />Part C. - Project Sponsor Financial Information <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following infonnation is <br />needed to assist the CWCB in a preliminary assessment of the applicant's financial capacity. It is <br />also requested that the project sponsor submit with this application, copies of the three most recent <br />annual reports, fmancial statements, corporate reports or other current documentation of fmancial <br />condition and operations. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.