My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02062
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2012 7:49:36 AM
Creation date
7/11/2007 9:06:40 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150211
Contractor Name
Highland Ditch Company
Contract Type
Loan
Water District
5
County
Boulder
Weld
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE 7 <br />OPINION OF COST <br />FOOTHILLS RESERVOIR <br />Alternative No. 1 - Core Trench <br />1ITEM <br />DESCRIPTION <br />rQUANTITY <br />UNITS <br />UNIT <br />PRICE <br />AMOUNT <br />1. <br />Mobilization, Insurance, Bonds <br />1.00 <br />L.S. <br />$ 16,000.00 <br />$ 16,000 <br />2. <br />Stripping <br />5700.00 <br />C.Y. <br />$ 3.25 <br />$ 18,525 <br />3. <br />Excavation & Fill <br />36500.00 <br />C.Y. <br />$ 7.60 <br />$ 277,400 <br />4. <br />Borrow Material <br />7300.00 <br />C.Y. <br />$ 3.10 <br />$ 22,630 <br />5. <br />Riprap <br />1050.00 <br />TONS <br />$ 29.00 <br />$ 30,450 <br />6. <br />Riprap Bedding <br />350.00 <br />TONS <br />$ 25.00 <br />$ 8,750 <br />7. <br />Sand Blanket <br />900.00 <br />TONS <br />$ 26.00 <br />$ 23,400 <br />8. <br />Roadbase <br />530.00 <br />TONS <br />$ 20.00 <br />S 10,600 <br />9. <br />Piezometers <br />8.00 <br />Each <br />$ 1,800.00 <br />$ 14,400 <br />10. <br />Movement Monuments <br />5.00 <br />Each <br />$ 165.00 <br />$ 825 <br />11. <br />Station Markers <br />13.00 <br />Each <br />$ 125.00 <br />S 1,625 <br />12. <br />Seeding <br />10.00 <br />Acres <br />$ 1,000.00 <br />$ 10,000 <br />13. <br />Erosion Control <br />1.00 <br />L.S. <br />$ 5,500.00 <br />$ 5,500 <br />14. <br />Surveying <br />1.00 <br />L.S. <br />$ 6,650.00 <br />$ 6,650 <br />15. <br />Dewaterin <br />1.00 <br />L.S. <br />$ 22,000.00 1 <br />$ 22,000 <br />TOTAL CONSTRUCTION COST $ 468,755 <br />ENGINEERING $ 84,376 <br />CONTINGENCY ® 10% $ 46,876 <br />TOTAL COST $ 600,006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.