My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150205 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150205 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2011 3:17:40 PM
Creation date
7/11/2007 8:14:39 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150205
Contractor Name
Veits Pipeline Company
Contract Type
Loan
Water District
34
County
Montezuma
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />8. Any Funding Member who fails to pay an assessment to the Company <br />when due shall be a Defaulting Member and, as such, agrees to be <br />subject to applicable policies and regulations of the Company which may <br />include, but is not limited to, imposition of fines, fees, penalties, interest <br />and loss of rights as a member. <br /> <br />9. The Funding Members agree to share the costs arising from the NRCS <br />Contract and for the CWCB Loan repayment based upon the maximum <br />amounts of water (in cubic feet per second-CFS) that each will be <br />entitled to have carried through the pipeline by the Company, as follows: <br /> <br />User <br />Alexander <br />Burk <br />Burton <br />Davis <br />Feast <br />Gawthrop <br />Goode <br />Goodman <br />Harper <br />Holgate <br />Horrocks <br />Lassen <br />Lee,L <br />Lee.S <br />McLaws <br />Noland <br />Pace <br />Pauli <br />Sasso <br />Turner <br />Varney <br />Webster <br />Whitehead <br /> <br />cfs Percent <br />1.670 13.90% <br />1.940 15.83% <br />0.125 1.92% <br />0.252 2.83% <br />0.210 2.53% <br />1.000 8.20% <br />0.100 01.75% <br />o JJ4'L f> \ 1.33% <br />0.255 2.86% <br />0.120 1.88% <br />0.580 5.19% <br />0.342 3.43% <br />0.210 3.48% <br />0.210 2.53% <br />0.280 3.04% <br />2.710 20.46% <br />0.100 1.75% <br />0.100 1.75% <br />0.120 1.88% <br />0.100 1.75% <br />0.100 1.75% <br />0.120 1.880~O <br />0.100 1.75% /A fbS <br />~' ,0- <br />The Company agrees that the Funding Members shall be entitled to <br />carry the above maximum amounts of water in the pipeline. <br /> <br />10. Company agrees that any Member of the Company or any non-Member <br />that seeks to have water carried in the pipeline not included in Section 9 <br />above shall be required to bear a proportional share of the costs arising <br />from the NRCS Contract and for the CWCB Loan repayment through a <br />reallocation of the of the percentages in Section 9 above: provided <br />however, that the Company shall also impose other costs upon the <br />carriage of such water in the pipeline. <br /> <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.