My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150205 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150205 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2011 3:17:40 PM
Creation date
7/11/2007 8:14:39 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150205
Contractor Name
Veits Pipeline Company
Contract Type
Loan
Water District
34
County
Montezuma
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Funding Agreement <br /> <br />This Agreement is made this 17th day of May 2005, between The Number Six <br />Ditch Company (the Company), a Colorado corporation, and the undersigned <br />members of the Company, (the Funding Members). <br /> <br />Whereas, The Bylaws of the Company require that "The Company may not <br />undertake additions and/or improvements to the Ditch without approval in <br />advance by the Membership. The Membership shall be presented with a written <br />resolution defining the addition and/or improvement to be voted on and also <br />presented with a Funding Agreement signed by the Member or Members that <br />agree to pay for the addition and/or improvement, if approved by the <br />Membership. The Funding Agreement shall set forth details of the proposed <br />work, the estimated cost of the work, the method for sharing the cost, including <br />any overruns that may occur, and the proposed schedule for conduct of the work <br />by the Company", and <br /> <br />Whereas, The Natural Resource Conservation Service of the US Department of <br />Agriculture has included the Ditch in the Mancos Valley Salinity Control Project <br />and the Company and NRCS have entered into a Conservation Program <br />Application/Contract (the Contract) under which the Company could become <br />eligible for funding and other assistance to upgrade the Ditch to a pipeline, and <br /> <br />Whereas, The undersigned Funding Members desire that the Company accept <br />the NRCS proposal for the pipeline to be installed in the Ditch for delivery of <br />irrigation water to the Members of the Company and receive the design <br />assistance and 75% co-funding offered by NRCS, and <br /> <br />Whereas, The Colorado Water Conservation Board (the CWCB) has committed <br />to make a loan to the Company to finance the Company's share of cost for the <br />pipeline to be installed by NRCS, and <br /> <br />Whereas, The Funding Members desire that the Company accept the loan from <br />the CWCB to finance the Company's share of the pipeline cost. <br /> <br />Now, therefore, in consideration of the mutual covenants contained herein, the <br />Company and the below signed Funding Members agree as follows: <br /> <br />1, The Additionsllmprovements to the Ditch- The Additionsllmprovements <br />proposed for the Ditch are the installation of the pipeline and related <br /> <br />Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.