Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CWCB Construction Fund Loan Application <br /> <br />from nearest town, as well as legal description, if known. Sixteen miles northwest of Poncha <br />Springs, Colorado, located on the North Fork of the South Arkansas River in Township 50 <br />North, Range 6 East, of the NMPM, Chaffee County <br /> <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water uses to be served and service area. Attach separate sheet, if needed. _ <br />(See Attached) <br /> <br />6. Will the acquisition of additional water rights be necessary? YES <br />If YES, please explain. <br /> <br />NO XX <br /> <br />7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and <br />attomey(s). <br />NAME <br /> <br />ADDRESS and PHONE <br /> <br />Christopher Manera, P.E._ P.O. Box 1301 <br />Rifle, CO 81650 <br />Ivan A. Walter, P.E. 6030 S. Cherrywood Circle <br />Centennial, CO 80121 <br />Julianne Woldridge 530 Communications Circle, Suite 204 <br />Colorado Springs, CO 80905 <br /> <br />(970) 625-4933 <br /> <br />(303) 798-5967 <br /> <br />(719) 520-9288 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. North Fork Dam Study <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, ifknown. <br /> <br />Estimated Engineering Costs: <br />Estimated Construction Costs: <br /> <br />$334,000 <br /> <br />$2,975,852 <br /> <br />3 <br />