My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150185 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150185 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2012 7:57:23 AM
Creation date
7/10/2007 3:03:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150185
Contractor Name
Mancos Valley Beaver Ditch Company
Contract Type
Loan
Water District
34
County
Montezuma
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mancos Valley Beaver Ditch Loan Application 1/4/2006 3:19 PM orw <br />Alternative No. 9 was considered unacceptable because the Members need to improve the <br />Ditch. The Ditch is located on a glacial gravel deposit that sits atop a layer of Mancos shale. <br />Excessive water is being lost to seepage and evaporation. The drought',of 2002 illustrated the <br />how poorly the existing structure performs. Although water was diverted from the river during <br />the drought, the water was lost to seepage and evaporation and the Members were unable to <br />raise a hay crop and had no stock water for weeks at a time. The Members also wish to <br />upgrade their on -farm practices for more efficient use of water. <br />Alternative No. 2 was ruled out because the cost of individual pipeline projects is prohibitive <br />and a single pipeline without a cost subsidy is beyond the ability of the members to repay. <br />Alternative No. 3 was selected because of the NRCS 75 %cost share, the engineering services <br />provided by NRCS and the timing for the Salinity Control Project meets the Members needs. <br />The selected alternative, Alternative No. 3, will include a new diversion structure; flow rate <br />measurement structure, a single pipeline of 21 inch diameter for the first 4200 feet, a graduated <br />PVC pipeline from 18 to 15 inch diameter for the remainder of approximately 21,000 feet of PVC <br />pipeline, varying in size from 18 inch down to 15 inch to the final delivery point on the Wolcott <br />Ranch, ; metered delivery points to each Member; various valves, drains and vents; and a <br />screen structure at point of diversion on the river. <br />Cost Estimate <br />The Montezuma County Office of the NRCS has prepared engineering designs and cost <br />estimates for the Project. The NRCS Preliminary Design report and detailed cost estimate are <br />included in Appendix D. <br />The estimated cost of the Project from the NRCS 2005 Cost Docket is $904,750 <br />The cost breakdown is summarized in Table 1. , <br />Table 1 Mancos Valley Ditch Company Pipeline Project- NRCS Cost Estimate <br />Item <br />Pipeline Segments <br />Length <br />Diameter' <br />Cost/ft $ <br />Amount $ <br />River to Jakowski pipeline <br />4,200 ft <br />21 in <br />j <br />$51,000 <br />Jankowski >White> Colbert pipeline <br />12,800 ft <br />18 in <br />$190,000 <br />Colbert> Wolcott Pipe Line <br />3700ft <br />15 in <br />1 <br />$106,000 <br />Total <br />1 <br />$904,750 <br />Implementation Schedule <br />The NRCS completed the final design on December 2, 2005. <br />March 2005 and to be completed in phases during2006. <br />Page 8 of 16 pages <br />Construction is expected to begin ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.