My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150185 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150185 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2012 7:57:23 AM
Creation date
7/10/2007 3:03:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150185
Contractor Name
Mancos Valley Beaver Ditch Company
Contract Type
Loan
Water District
34
County
Montezuma
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mancos Valley Beaver Ditch Loan Application 6/3/2004 7:40 AM orw <br />choice of a dual pipe line for the first 42W feet from the river diversion structure to the <br />Jankowski delivery point gives the lowest project cost, <br />Cost Estimate <br />The Montezuma County Office of the NRCS has prepared engineering designs and cost <br />estimates for the Project. The NRCS Preliminary Design report and detailed cost estimate are <br />included in Appendix D. <br />The estimated cost of the Project ' jil3,000 <br />The cost breakdown is summariz able 1. <br />Table 1 Manco Valley Ditch Company Pipeline Project- NRCS Cost Estimate <br />Item <br />Length <br />Diameter <br />Cost/ft $ <br />Amount $ <br />Jankowski Pipe Line <br />4,200 ft <br />12 in <br />$51,000 <br />White >Colbert>Wolcott Pipe Line <br />7,300 ft <br />18 in <br />$190,000 <br />White >Colbert>Wolcott Pipe Line <br />TBD <br />15 in <br />$106,000 <br />White >Colbert>Wolcott Pipe Line <br />TBD <br />10 in <br />$66,000 <br />Total <br />$413,000 <br />Implementation Schedule <br />The NRCS is expected to complete the final design by September 2004. Construction is <br />expected to begin October 2004 and to be completed in phases during 2004 and 2005. <br />Permitting <br />All easements and rights of way have been secured. The Company expects to be exempt from <br />404 permitting by Statutory exemption, 33 CFR Section 323.4(a) 3. This will be confirmed with <br />the Army Corps of Engineers. <br />Institutional Considerations <br />Entities that are, or may be, involved in the design, construction, and financing of the project <br />include: <br />• Mancos Valley Beaver Ditch Company; financing, construction and project management. <br />• Natural Resources Conservation Service (NRCS); 75% cost share, design, construction <br />supervision and inspection. <br />Page 7 of 15 pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.