My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes Mar 2007 CBRT
CWCB
>
Board Meetings
>
Backfile
>
Backfile
>
Minutes Mar 2007 CBRT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 4:16:53 PM
Creation date
7/10/2007 2:55:48 PM
Metadata
Fields
Template:
Basin Roundtables
Basin Roundtable
Colorado
Title
Minutes
Date
3/26/2007
Basin Roundtables - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Western Slope <br /> <br />Eastern Slope <br /> <br />Colorado <br />Y amp a- White <br />Gunnison <br />San Juan <br /> <br />Arkansas <br />Rio Grande <br />North Platte <br />South Platte <br />Denver Metro <br /> <br />[n-stream flow. A flow rate appropriated by the Colorado Water Conservation Board which <br />represents the amount of water deemed necessary to protect the environment to a reasonable <br />degree. This determination takes into consideration the availability of water under water rights <br />administered. An In-Stream Flow right is administered in priority, along with all other water <br />rights on the stream. <br /> <br />Maybell Pump Back: A proposal by the Northern Water Conservancy District to pump water from <br />the Yampa River to the Eastern Slope. <br /> <br />NCNA.I Non consumptive needs assessment conducted pursuant to HB 1177 to determine the <br />amount of water needed to meet environmental and recreational uses. <br /> <br />Northern: The Northern Colorado Water Conservancy District, the agency that contracts for <br />delivery of water from the Colorado Big Thompson Project that diverts water from the Upper <br />Colorado River at collection facilities in Grand County for distribution to the eastern slope. <br /> <br />PBO: A Programmatic Biological Opinion for the Recovery of the Endangered Colorado River <br />fish, which requires a number of measures which function as "reasonable and prudent alternatives" <br />for diversions that would otherwise harm endangered fish in the Upper Colorado River. <br /> <br />RICD: Recreation In Channel Diversion. A water right awarded in order to protect recreational <br />boating in the river. <br /> <br />Senate Bill 179: Passed in 2006 by the Colorado legislature, this allocates $10 million per year for <br />four years to be allocated among the 9 roundtables to pay for water projects or studies (aka the <br />Water Supply Reserve Account). <br /> <br />Shoshone Call: Xcel energy has a call on the Colorado River with a priority dating to 1907 <br />permitting it to run 1,250 cfs through the Shoshone power plant turbines. In 2006, Xcel and <br />Denver Water entered into an agreement which permits Denver to reduce the call by 550 cfs at the <br />Shoshone power plant between March 20 and May 20 in years that Denver Water's projected <br />reservoir storage capacity is less than 80%; discussed at the July 2006 CBRT meeting. <br /> <br />SWSI: CWCB manages the Statewide Water Supply Initiative (SWSI), which was created to <br />study long term water needs in Colorado after the Big Straw Initiative failed in 2003. <br /> <br />L\CWCB Imaging\Caleb\Minutes\Colorado\2007\Minutes Mar 2007 CBRTdoc <br /> <br />7 <br /> <br />7/l< <br />
The URL can be used to link to this page
Your browser does not support the video tag.