My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02054
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2011 10:13:39 AM
Creation date
7/10/2007 2:37:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150201
Contractor Name
Carpenter and Mitchell Ditch Company
Contract Type
Loan
Water District
71
County
Montezuma
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />$657,800 <br /> <br />Implementation Schedule <br /> <br />The NRCS is expected to complete the final design by August 2005. Construction is <br />expected to begin September 2005 and to be completed in phases during 2005 and <br />2006. <br /> <br />Permitting <br /> <br />All easements and rights of way have been secured. The Company expects to be <br />exempt from 404 permitting by Statutory exemption, 33 CFR Section 323.4(a) 3. This <br />will be confirmed with the Army Corps of Engineers. <br /> <br />Institutional Considerations <br /> <br />Entities that are, or may be, involved in the design, construction, and financing of the <br />project include: <br />Carpenter and Mitchell Ditch Company; financing, construction and project <br />management. <br />Natural Resources Conservation Service (NRCS); 75% cost share, design, <br />construction supervision and inspection. <br />Colorado Water Conservation Soard (CWCS); financing. <br /> <br />The Company will be the lead for the financing, design, and construction of the project <br />and will be the entity entering into contracts and agreements for the services to be <br />provided. <br /> <br />Financial Analysis <br /> <br />The Company is applying for a loan from the CWCS in amount of $506,000, to cover <br />total cost of all construction and materials. Upon final approval of the constructed <br />Project by NRCS, NRCS will pay to the Company the 75% cost share, which will be <br />used by Company to pay down the loan amount to approximately $126,000. <br />Table 2. Sources of Funding <br /> <br />Entity Grant Short-term Loan <br />$506,000 $126,000 <br />$380,000 $0 $0 <br /> <br />Long-term loan <br />Company $0 $0 <br />Totals $380,000 <br /> <br />CWCB <br />$0 <br />$506,000 <br /> <br />$0 <br />NRCS <br />$126,000 <br /> <br />The Company will cover any costs that exceed the NRCS estimated Project cost. <br /> <br />The Company is requesting a 30-year loan from the CWCS. The standard agricultural <br />
The URL can be used to link to this page
Your browser does not support the video tag.