Laserfiche WebLink
<br />Shoshone Call. Xcel energy has a call on the Colorado River with a priority dating to 1905 <br />permitting it to run 1,250 cfs through the Shoshone power plant turbines, as well as an additional <br />1941 water right for 158 cfs. The capacity of each turbine is approximately 704 cfs. <br /> <br />L\CWCB Imaging\Caleb\Minutes\Colorado\2006\Colorado Minutes Nov 2006 CBRT.doc <br />