My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes April 24 06 IBCC Colo Basin
CWCB
>
Board Meetings
>
Backfile
>
Backfile
>
Minutes April 24 06 IBCC Colo Basin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 4:16:49 PM
Creation date
7/10/2007 1:58:27 PM
Metadata
Fields
Template:
Basin Roundtables
Basin Roundtable
Colorado
Title
Minutes
Date
4/24/2006
Basin Roundtables - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />materials and fact sheets. <br /> <br />Lewis Meyer made a motion to put an item on the agenda for the next meeting on how to <br />move the issue of baseline data further along. The motion was seconded by Ken <br />Ransford. <br /> <br />Harlan: Baseline for stream flows or future needs? <br /> <br />Lewis: Baseline for minimum stream flows, environmental needs, recreational needs, <br />methodology to determine the baseline. <br /> <br />John Redifer: CWCB takes two years to determine in-stream flows. <br /> <br />Eric Hecox: This will be on the agenda for the next meeting. <br /> <br />L\CWCB Imaging\Caleb\Minutes\Colorado\2006\Minutes April 24 06 IECC Colo Basin.doc <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.