My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02042
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ02042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2011 3:15:20 PM
Creation date
7/10/2007 1:35:54 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150241
Contractor Name
DeBeque, Town of (Acting by and through its Irrigation System Enterprise)
Contract Type
Loan
Water District
0
County
Mesa
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Loan Program <br />Project Data Sheet <br /> <br />Borrower: Town of DeBeque County: Mesa <br /> <br />Project Name: Irrigation System Improvements Project Type: Secondary Water System <br /> <br />Drainage Basin: Colorado River Water Source: Roan Creek <br /> <br />Total Project Cost: $370,000 Funding Sources: CWCB <br /> <br />Type of Borrower: Low Income Municipal Average Reservoir Delivery: 710 acre-feet <br /> <br />Loan: $250,000 (70% of total Project cost) Interest Rate: 3.25% Term: 30 years <br /> <br />The Town of DeBeque is constructing a new collection structure in the Colorado River and <br />pump/piping system as part of the Irrigation System Improvements Project. The Project is expected <br />to cost $370,000 and provide an improvement to the Town's irrigation water delivery system. The <br />improvements will increase delivery quantity and efficiency and will also reduce the demand on the <br />Town's drinking water supply. The Town is located approximately 30 miles east of Grand Junction <br />and seNes 480 residents with sewer and water. The present irrigation system seNes approximately <br />half of the Towns residence however the system is often low on pressure and unreliable. In addition <br />to increasing system reliability, this project will help utilize a recently acquired 3.5 cfs surface water <br />right on the Colorado River. This right combined with the 1.7 cfs right from Roan Creek will seNe <br />the needs of the 480 residences, two schools and a cemetery. Construction of the pipeline and <br />pump station is expected in early 2007. <br /> <br /> <br />, r ) <br /> <br />,> ~~,s2~;t.r~;'~ <br /> <br />--. ~ > --~~..-~+-:;:~-~.}-' <br /> <br />.".i <br /> <br />...:~,; <br />"-"..; <br /> <br />~~s~!f~I~I~ <br /> <br />Ii .. <br /> <br />.",1> <br /> <br />i' .--- <br />r . <br /> <br />~;.L~r <br />~ , <br />..::.~" c"~: €t! ! <br />-~'.'~~r1:~'~ .; 'm>f.>4:j <br /> <br /> <br />.{.,~c~~..,.~~~~i€f'.?~;~~;;'~;.;; <br /> <br /> <br />Copyrigh1 (e) 1999. Maplech. Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.