My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02040
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 9:54:45 AM
Creation date
7/10/2007 1:10:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-034
C150206
Contractor Name
Overland Ditch and Reservoir Company
Contract Type
Loan
Water District
0
County
Delta
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />- s mae rO.1ec os <br />Item Quantity Unit Unit Price Total Amt <br />Mobilization and Demobilization 1.0 Lump Sum $50,000.00 $50,000 <br />Emban1cment Excavation and Placement 70,000 Cubic Yard $6.50 $455,000 <br />Furnish and Place Filter Drain Material 1,700 Cubic Yard $65.00 $110,500 <br />Furnish and Place Drain Pipe 4,000 Cubic Yard $20.00 $80,000 <br />Furnish and Place Rip Ftap 4,500 Cubic Yard $45.00 $202,500 <br />Spillway Fteconstruction 75 Cubic Yard $700.00 $52,500 <br />SUBTOTAL $950,500 <br />10 Percent Contingency $95,050 <br />SUBTOTAL $1,045,550 <br />10 Percent Engineering and PeIlIlitting $104,560 <br />10 Percent Inspection $104,560 <br />TOTAL ESTIMATED COST $1,254,550 <br /> <br />TABLE 2 E ti t d P . t C t <br /> <br />IMPLEMENTATION SCHEDULE: <br /> <br />Following is a summary of the anticipated schedule: <br /> <br />FIGURE 1 - Anticipated Project Schedule <br /> <br /> 200S 2006 200i <br />! 'r.. 0;:1{ l'n"U I". 1..1 <br />1"1.000 HYDROU)(jY - - <br />'.01.1 r, . ""^"n - f- <br />ENVIRONMENTAL ANALYSIS <br />,. <br />FINAL DES!riN,l:ONTRAfT DOCUMENTS <br />'l.TATJ; i..' ""'"."\11 <br />CONSTRUCTION DID <br />CONSTR UCTION <br /> <br />The schedule is highly dependent on two considerations: <br /> <br />1. The NEPA and peIlIlit process. For the Overland dam rehabilitation worlc perfoIlIled in 1986 <br />and 1987, the time from initiating the permitting process until start of construction was 17 <br />months, from January, 1985 until May, 1987. Therefore, the above schedule allows the same <br />amount oftime. However, if that process is sufficiently shorter for the currently proposed <br />restoration project, it might be possible to start construction some time in 2006. <br /> <br />2. Because of the elevation of the project site (nearly 10,000 ft), the construction season is very <br />weather dependent and the maximum construction season is limited to May through <br />November. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.