My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150206 Approval letter
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150206 Approval letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 9:54:45 AM
Creation date
7/10/2007 1:10:38 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-034
C150206
Contractor Name
Overland Ditch and Reservoir Company
Contract Type
Loan
Water District
0
County
Delta
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />Overland Ditch and Reservoir Company <br />July 12, 2005 <br />Page 3 of 5 <br /> <br />Agenda Item Sa <br /> <br />Proiect Description <br /> <br />The purpose of this project is to store a conditional storage water right that will supply supplemental <br />irrigation water and the possibility of augmentation water in the future. Three alternatives have been <br />considered: <br /> <br />1. No action <br />2. Transfer of the storage right to another existing or potential reservoir location. <br />3. Provide additional storage capacity at the existing Overland Reservoir. <br /> <br />Alternative 3 was selected because failure to store the conditional water rights may result in the loss of <br />the right, and potential sites for expansion are problematic and very expensive. <br /> <br />The project will involve elements needed to increase the normal water surface elevation by about 3.8 ft. <br />Elements include the following: <br /> <br />· Raising the main dam and auxiliary dam crest elevations by about 1.5 to 2.0 ft and adding rip <br />rap needed to protect the embankment below the completed normal water surface. <br /> <br />· Upgrading the auxiliary dam to include internal and toe drainage, increasing the crest width, <br />adding rip rap as necessary to protect the embankment below the completed normal water <br />surface and adding embankment to the downstream slope to flatten it toa more moderate and <br />more stable slope. <br /> <br />· Raising the spillway crest level by 3.8 feet to allow for storage of the additional water. This will <br />be accomplished by increasing the height of the existing concrete weir wall as well as the <br />training and retaining walls. <br /> <br />Construction is expected to start in the summer of 2007. However, the construction schedule is highly <br />dependent on two considerations: <br /> <br />· NEPA Permit: The project is expected to start in the summer of 2007. The schedule is <br />dependent on the duration of the NEPA Permit process. In 1987, the dam rehabilitation work <br />required 17 months from initiating the permit until start of construction. If this NEPA process is <br />shorter it may be possible to start construction sometime in 2006. <br /> <br />· Elevation: Because the elevation of the project site is nearly 10,000 ft, the construction season <br />is very weather dependent and the maximum construction season is limited to May through <br />November. <br /> <br />Total Project cost estimate is: <br /> <br />Construction <br />Contingency (1 0% of Const. Est.) <br />Planning/Permitting/Eng ineering <br />Total <br /> <br />$950,500 <br />95,935 <br />209.120 <br />$1,255,555 <br /> <br />Financial Analvsis <br /> <br />Table 1 shows a summary of the financial aspects of the Project for the current loan request. A CWeB <br />Loan of $1,130,000 will have an annual debt service obligation of $59,387 ($53,988 for annual loan <br />payment and $5,399 for the 10% reserve funding) for the loan terms of 2.5% for 30-years. The <br />
The URL can be used to link to this page
Your browser does not support the video tag.