Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TECHNICAL SERVICES PROVIDER (TSP) <br /> <br />Knudsen Engineering, Inc. <br />Mr. Gerald W. Knudsen, P.E. (President) <br /> <br />20156 Flint Lane <br /> <br />Morrison, Colorado 80465 <br /> <br />DESIGN TEAM ENGINEERS <br /> <br />Boesch-Fisher Engineering, Inc. <br />Mr. Brice Boesch, P.E. (president) <br />9362 South Crestmore Way <br />Highlands Ranch, Colorado 80126 <br /> <br />Lake Engineering Consultants, Inc. <br />Mr. Gary R. Lake, P.E. (Owner and Principal) <br />6923 South Miller Street, # 10 <br />Littleton, Colorado 80127 <br /> <br />Acknowledgement of those individuals who assisted in the preparation <br />of this Feasibility Report: <br />1) Mr. Dan Henrich <br />High Line Canal Company Project Superintendent <br />2) Mr. Dennis Tabor <br />High Line Canal Company Secretary <br />3) Mr. Greg Gerow <br />FPI Companies <br />Shatter, California <br />4) Mr. Scott A. Marshall <br />MISCO <br />3033 South Parker Road, <br />Tower 1, Suite 350 <br />Aurora, Colorado 80014 <br />5) Mr. Kirk Russell, P.E. and Mr. Bruce Johnson, P.E. <br />Colorado Water Conservation Board <br />1580 Logan Street <br />Denver, Colorado 80203 <br /> <br />ATTORNEY FOR THE IDGH LINE CANAL COMPANY <br /> <br />~r.RobertKrassa <br /> <br />1680 38th Street, Suite 800 <br />Boulder, Colorado 80301 <br />