Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Rocky Ford High Line Canal CO <br />P.O. Box 800 <br />Rocky Ford, co 81067 <br /> <br />July 26, 2005 <br /> <br />Kirk Russell, P.E. <br />Colorado Water Conservation Board <br />1580 Logan St, Suite 750 <br />Denver, CO 80203 <br /> <br />Dear Mr. Russell, <br /> <br />We have submitted a preliminary appl~Q for a eweB loan to replace Smith Siphon, which is owned <br />by the High Line Canal Co. We have hi~BOesch-FISCher Engineering Inc. to do the feasibility study. <br />The study witt be in accon:Jance with the CWCB guide lines. We request a grant of $5000.00 to pay up <br />to 50% of the cost of the feasibility study. <br /> <br />Sincerely, <br /> <br />~~ <br /> <br />Dan Henrichs <br />Superintendent of The High Line Canal Company <br /> <br />