My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150208 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150208 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2011 10:08:30 AM
Creation date
7/10/2007 12:48:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150208
Contractor Name
High Line Canal Company
Contract Type
Loan
Water District
17
County
Otero
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />1 <br />I <br />I <br />1 <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Rocky Ford High Line Canal CO <br />P.O. Box 800 <br />Rocky Ford, co 81067 <br /> <br />July 29, 2005 <br /> <br />Attachment 1 <br /> <br />The High line Canat is 87 miles long and services 2250 shares, 1 share on an average year wit! <br />inigate 10 acres. The head gates are located on the south bank of the Arkansas river, south of <br />BoOne Co. The water rights owned by The High Une Canal Company consist of <br />40cfs dated 12-31-1861 <br />.6 cfs 09-01-1867 ' <br />16 cfs 07"()1-1869 <br />32.5 cfs 03-07-1884 <br />30 cfs 06-30-1885 <br />2 cfs 03-11-1886 <br />380.5cfs 01-06-1890 <br />There are 3 siphons on the canal, 1st is at Chicosa creek, the 2nd is atApishapa River and the:f1 is <br />at Smith Arroyo. The canal runs in a south eastern direction until in dumps into dry creek south of <br />Rocky Ford, CO. <br />
The URL can be used to link to this page
Your browser does not support the video tag.