Laserfiche WebLink
<br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Ie <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Ie <br />I <br /> <br />Contents <br /> <br />TABLES Page <br />2.1 Cost of increasing Orchard Mesa Power Canal to convey 860 cfs 6 <br />2.2 Financing scenarios for enlargement of the Orchard Mesa Power Canal 8 <br /> <br />FIGURES <br />1.1 Site map <br /> <br />After page <br />2 <br /> <br />4.1 <br /> <br />Stokes Gulch siphon replacement <br /> <br />13 <br /> <br />APPENDICES <br />A Cost estimates <br />A.1 Cost estimate and calculations for Task 1 <br />A.2 Cost estimates for Task 2 <br />A.3 Cost estimates for Task 3 <br /> <br />2616-R1 <br /> <br />Orchard Mesa Irrigation District <br /> <br />Water Management Consultants <br />