Laserfiche WebLink
<br />MEMO <br /> <br />COLORADO WATER CONSERVATION BOARD <br />Water Supply Planning and Finance Section <br />'tV <br />Date: 6/Jj2005 <br /> <br />To: <br /> <br />Steve Shull <br />"\j \~ <br />Steve Biondo <br /> <br /> <br />Cc: <br /> <br />From: <br /> <br />Kirk Russell, PE <br /> <br />v-. <br />tb <br /> <br />RE: Orchard Mesa Irrigation District <br />Feasibility Study Small Grant Fund <br /> <br />Please set up a Purchase Order number of the Orchard Mesa Irrigation company (OMID) for up to $15,000. <br />This is for a project titled Power Canal Rehabilitation Feasibility Study. This project was approved at the <br />March 22, 2005 CWCB Board Meeting. The CWCB contribution is limited to 50% of actual costs of the <br />study with a maximum contribution of $15,000. The study will identify rehabilitation projects to solve <br />several problems that exist on the Power Canal system. <br /> <br />I have included the following documents for your use: <br /> <br />Approval Letter dated May 31, 2005 <br /> <br />Board Memo dated March 15,2005 (Revised March 25, 2005) <br /> <br />Scope of work and cost estimate (Attachment A & B) <br /> <br />Orchard Mesa Irrigation District - Taxpayer W-9 <br />