My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02036
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ02036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:40 AM
Creation date
7/10/2007 11:38:33 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
PO 060000000018
Contractor Name
Orchard Mesa Irrigation District
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />May 31,2005 <br /> <br />Bill Owens <br />Governor <br /> <br />Mrs. Rita Crumpton <br />District Manager <br />Orchard Mesa Irrigation District <br />668 38 Rd. <br />Palisade, CO 81526 <br /> <br />Russell George <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />RE: Non-reimbursable Funding for Power Canal Rehabilitation Project Feasibility Study <br /> <br />Dear Mrs. Crumpton, <br /> <br />I am. pleased to inform you that the Colorado Water Conservation Board (CWCB) has <br />approved your funding request. I understand the funds will be used to conduct a feasibility <br />study to evaluate the repair and rehabilitation of the District's Power Canal. The study will <br />meet the requirements of the CWCB Construction Fund Guidelines for feasibility studies. The <br />study will need to include, but not be limited to: an evaluation of project alternatives with an <br />identified selected alternative as a project to be financed; associated engineered cost estimate <br />for the project; identification of the sources offunding for the project, including the owner's <br />share, as well as the amount financed through CWCB; a financial analysis identifying any <br />assessment or rate increases required. <br /> <br />The Board recommended non-reimbursable funding from the Feasibility Study Small Grant <br />Fund to a limit of50% of actual study costs and a maximum of$15,000. I have attached a <br />copy of the updated Board Memo concerning the Orchard Mesa Irrigation District's request. <br />Please refer to the section: "Action taken by the CWCB on March 22,2005." <br /> <br />On behalf ofthe Board, I would like to thank you for applying for non-reimbursable funding <br />from the Colorado Water Conservation Board. <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.