My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02027
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:39 AM
Creation date
7/9/2007 3:24:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0044FX
Contractor Name
Larimer County, Board of County Commissioners
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />CONCEPTUAL COST ESTIMATE <br />EAST VINE CANAL <br /> <br />PROJECT: Dry Creek <br />PROJECT #6800024660.00 <br /> <br />NO. DESCRIPTION <br /> <br />QUANTITY <br /> <br />Baffle Block Spillway <br />1 Excavation <br />2 Structural Backfill <br />3 Concrete <br /> <br />1500 <br />---------- <br />300 <br />----~------ <br />113 <br /> <br />4 <br />5 <br />6 <br /> <br />Drop Structure <br />Excavation <br />Structural Backfill <br /> <br />Concrete <br /> <br />500 <br />300 <br />-- ----- <br />210 <br /> <br />7 <br />8 <br />9 <br /> <br />Drop Energy Dissipation <br />Excavation <br />Structural Backfill <br /> <br />Concrete <br /> <br />2500 <br />1500 <br />205 <br /> <br />ESTIMATED BY: G. Glunz <br />DATE: 11/01/99 <br /> <br />UNIT <br /> <br />UNIT COST TOTAL COST <br />$4.50 $6,750 <br />$12.00 $3,600 <br />$450.00 $50,850 <br />$4.50 $2,250 <br />$12.00 $3,600 <br />$400.00 $84,000 <br />$4.50 $11,250 <br />$12.00 $18,000 <br />$400.00 $82,000 <br /> ~ -~ <br />$4.50 $194,400 <br />$5.00 $14,500 <br />$2,000.00 $20,000 <br /> $491,200 <br /> $49,120 <br /> $540,320 <br /> $162,096 <br /> $60,000 <br /> $762,416 <br /> <br />cubic yards <br />cubic yards <br />cubic yards <br /> <br />cubic yards <br />cubic yards <br />cubic yards <br /> <br />cubic yards <br /> <br />cubic yards <br />cubic yards <br /> <br />Channel <br /> <br />10 <br />11 <br /> <br />Excavation 43200 <br />_._--~--------_._._------- <br />Compacted Fill 2900 <br /> <br />12 <br /> <br />Reseeding 10 <br /> <br />Subtotal <br /> <br />13 <br /> <br />MobilizationlDemobilization (10%) <br />Total <br />Design and Quantity Contingencies (30%) <br />Land Purchase and Flood Easements <br /> <br />EAST VINE CANAL TOTAL <br /> <br />cubic yards <br />cubic yards <br /> <br />acres <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.