My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02027
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:39 AM
Creation date
7/9/2007 3:24:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0044FX
Contractor Name
Larimer County, Board of County Commissioners
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTIINSIX <br /> <br />AlteroaUves AnalYsis <br /> <br />The recommended alternative provides several advantages compared to the 5,000 cfs diversion <br />proposed in the 1980 GAl study. Flood attenuation benefits properties above the Larimer and <br />Weld Canal while reducing the size and cost of the diversion structure. The East Vine Diversion <br />eliminates the complications with changing the confluence and potential flood increases with the <br />Cache la Poudre River. The East Vine Diversion also provides additional flexibility as a <br />component that can be used to aid with removing stormwater from the local Dry Creek basin to <br />the north of Fort Collins. <br /> <br />Table 6-2 <br /> <br />Comparison of Estimated Costs* for Downstream Storage Alternatives <br /> <br /> <br />...-......................... <br />-.:.:.;.:.;-:.;.:.:.;.:.:.:.;.:.:.:.:.:-:.:.:.:.:.:.:.:.:. <br />.......................-..... <br />................h........... <br />..--......................... <br />.......................-..... <br />................._.........h <br />..h......................... <br />............................. <br />.................--.....-.... <br />....-.....--................. <br />............................. <br />..-.......-.................. <br />.................h.......... <br />...-.............-....--..... <br />................__...h...... <br />.........-............_....h <br /> <br />Segmented Fuse Plug <br /> <br />Dry Creek Upgrades <br /> <br />Downstream Storage <br /> <br />Larimer and Weld Canal <br />Modifications <br /> <br />East Vine Canal <br /> <br />SCADA System <br /> <br />Sub Total <br /> <br />Design Engineering and <br />Construction (25%) <br /> <br />TOTAL ESTIMATED COST <br /> <br />$ 300,000 $ 300,000 $ 300,000 <br />$ 200,000 $ 200,000 $ 200,000 <br />$3,100,000 $ 2,300,000 $ 3,500,000 <br />$ 200,000 $ 200,000 $ 200,000 <br />$ 800,000 $ 800,000 $ 800,000 <br />$ 150,000 $ 150,000 $ 150,000 <br />$4,750,000 $ 3,950,000 $ 5,150,000 <br />$1,187,500 $ 987,500 $ 1,287,500 <br />$5,937,500 $ 4,937,500 $ 6,437,500 <br /> <br />*Flood Easements and Land Purchase Costs Included <br /> <br />TIProjectsl682466DDry CrkDiversionLarimerCountylSub_00I12.D Word ProcIFlood Control P1an.Rpt.doc 04/24100(11 :14 AM) 6-2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.