Laserfiche WebLink
<br />'I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I Ii, <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />related to administration of the enterprise funds. This amount has been included within the <br />operation and maintenance component ofthe proposed budget. <br /> <br />VIII. <br /> <br />Dry Creek Flood Control Plan Implementation Schedule <br /> <br />Compilation of a realistic schedule is a key component of a successful project. The following <br />schedule for implementation of the proposed project has been prepared taking into account the <br />time and attention to detail required to successfully implement a complex project. Prior to <br />preparation of this feasibility study, several years have been spent in engineering studies, <br />meet~ngs, presentations, and one on one discussions with property owners about a project. <br /> <br />The schedule for implementation of the Dry Creek Flood Control Plan is as follows: <br /> <br />Completion and Submittal of Feasibility Study <br />Form Dry Creek Stormwater Utility <br />Meeting of Colorado Water Conservation Board <br />Public Outreach <br />Legislative Hearings <br />Adopt Rate Ordinance for Dry Creek Stormwater Utility <br />Begin Collections <br />Negotiate Agreement with Larimer-Weld Irrigation <br />Amend City-County Intergovernmental Agreement <br />Obtain CLOMR from FEMA <br />Sign Formal Loan Contract with CWCB <br />Begin to Draw on Loan <br />Project Design <br />Begin Construction <br />Project Operation and Repayment <br /> <br />October 11, 2000 <br />October 24, 2000 <br />November 20,21, 2000 <br />November 2000, through June 2001 <br />Spring, 2001 <br /> <br />June, 2001 <br />Summer and Fall, 2001 <br />Summer and Fall 2001 <br />Summer and Fall 2001 <br />Winter, 2001 - 2002 <br />2002 through 2004 <br />Spring, 2002 through Jan, 2003 <br />February, 2003 <br />2004 to 2034 <br /> <br />The above schedule is based on approval of a loan by the Colorado Water Conservation Board <br />and the General Assembly in the 2000-200 I cycle of approvals. The reader will note that ifthe <br />loan is not approved, the financial structure of the project will be greatly altered, and will affect <br />subsequent tasks such as formalizing an agreement between Larimer County and the City of Fort <br />Collins. An answer from the state about the loan is needed so that the agreement between City <br />and County can be appropriately structured. For that reason, the County is requesting a hearing <br />before the Colorado Water Conservation Board at their November 2000 meeting instead of a <br />later meeting. <br /> <br /> <br />The schedule also provides for finalizing a loan contract with the CWCB during winter of 2000, <br />2001. This will allow time for the City and County to finalize their agreement before the County <br />signs a contract with the State. This schedule will also provide time for the County to establish a <br />record of collections from the Dry Creek Stormwater Utility before contracting with the State for <br />the loan. During the period from June 2001 through January 2002, the CLOMR will be prepared <br />and submitted to FEMA. Finally, it is expected that the CLOMR will be approved prior to <br />finalization of the loan contract, and the final design process will be initiated immediately after. <br /> <br />25 <br />