My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02027
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:39 AM
Creation date
7/9/2007 3:24:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0044FX
Contractor Name
Larimer County, Board of County Commissioners
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I' <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />At the completion of the public outreach period, in June or July 2001, a public hearing will be <br />held before the Larimer County Board of Commissioners to consider adopting rates for the <br />Larimer County Dry Creek Stormwater Utility. <br /> <br />VII. Financial Feasibility of Recommended Institutional Alternative <br /> <br />The fee structure for the Larimer County Dry Creek Stormwater Utility will consist of two <br />components. One component, the capital fee component, will be used to pay for capital <br />improvements that are or will be contemplated within the basin. In addition to the Dry Creek <br />Flood Control Project, the capital component will be used to pay one half of the cost of minor <br />stormwater improvements in subdivisions and to reconstruct certain drainage facilities along <br />County rights of way within the Local Basin. Finally, an operations and maintenance component <br />will be based on the projected cost of staffing, administration, and maintaining the improvements <br />for the utility. It is believed that this fee structure will provide the most fair and equitable <br />distribution of costs among residents in the County and between residents of the City and the <br />County. <br /> <br />Projected Budget for the Dry Creek Stormwater Utility <br /> <br />An analysis was conducted of revenue required to support staffing, operation and maintenance of <br />the utility as well as the County's portion of capital improvements. Initially, the total fee revenue <br />to support the planned operation of the utility will be $32,000 per month or $384,000 per year. <br />The amount which will be initially budgeted for operation and maintenance, based on projected <br />staff salaries and experience with the West Vine Stormwater Utility is $37,000 per year. This <br />amount will pay for 0.30 of an FTE engineer for handling the administration of the utility, and <br />dealing with customer service issues. At the time of completion of the improvements, this <br />amount will be increased to pay for maintenance of the facilities. The amount which will be <br />budgeted for all capital improvements will initially be $347,000 per year, or $28,917 per month. <br />Collections of monthly payments by the utility are to be made by the East Larimer County Water <br />District (ELCO). The Board of Directors of the ELCO District has approved in concept the plan <br />for the district to act as contract billing agent. The District would not be responsible for <br />enforcement of collections or delinquencies. <br /> <br />Proposed Financing of the Dry Creek Flood Control Project <br /> <br />As stated earlier, the total estimated cost of improvements for the Dry Creek Flood Control Plan <br />is $5.4 million. Of this amount, the City and County have agreed that the costs of the project will <br />be divided between the two entities based on the area within the floodplain. On this basis, <br />Larimer County will pay 47% of the project cost, or $2.5 million and the City of Fort Collins will <br />pay 53%, or $2.9 million. <br /> <br /> <br />The facilities contemplated for construction as part of the Dry Creek Flood Control Plan do not <br />lend themselves to piecemeal construction. Because they form a system where each part is reliant <br />on each other part, they must be constructed all at once. Taking into account the source of <br />funding, it is apparent that money must be borrowed to enable completion of the improvements <br />all at once. Sources of debt financing for a stormwater utility include the private municipal bond <br /> <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.