<br />Approximately one w:eek after the' r,eview meeti.ng a memol will be issued with forma~
<br />responses to c1omments. The Engineer's Project. 1vi,an age r and, ProJect En,gin.e.er wi~~
<br />attend the meetin,g'~ oth_er team members will be available ifn.ecessary..
<br />
<br />· Preseuta:tioDs - These -meetin.gswiil be for' presentat[,ons to OrcllardCfty and/or Orc:hard
<br />City's 8,oardM'em,bers. It is anti,ci,pated that three pres-entation meeting.swi.ll be held.
<br />The firSt wH~, be th,e kick-off.meeting, th,e .secon,d coincurrent \vith Sllbmittai of the D'raft
<br />F]nal- Design, and the th.ird afler th,e su~mitta"( alfthe Final Design,. The Project Prm.cipal"
<br />Project: Man,ager and Project En,gineer wi.ll ;attend the presentation meetin,gs,. Other tieam
<br />mem bers wi 11 be available, if necessary +
<br />
<br />Task ,A200: lufor.matiOD Exehang:e a~Qd proj-eet Kick~off:
<br />
<br />At theklc.k~ffmeeting specific information will be req,uested such as ti1e--inpoints, final
<br />hydraulic requirements, operational reql.lirements, proc.esscon.trol ~equirements, 've~rification of
<br />required me chanica I systems and an'y oots'ide: interface tb 8't mig,h.t be req,uited'i A ,des ign eri teria. .
<br />will be pliep,ared to sUm~marize the En,gin.eer's uI1derstandin,g ofth.e final design requiitements"
<br />The design .criteria will pro'Yide tile b,asis for the final design. The engineer will s,ubmit th.e dra'ft .
<br />and final desi,gn criteria in _PDiF format.
<br />
<br />TJask AJO:O: Amternatlve Analysis:
<br />
<br />Smith 'Wi:lliams will 'com:pfete an alt'iemati.vie analysis 'ofup ;to three Iconstruction methods for the
<br />water r,eservnir. 'The alternative analysis will be completed for determining the most cost
<br />,efficient dam structure for th.e propo.sed res:enroir+ The alternatives will take int,o con,sideration
<br />the d.esign criteria developed in Task A200, as well as regulatory requirements and property
<br />restrictions. "The alternatives will be co'mpared and eval.uat.ed using a number of ranking criteria
<br />l.D;cluding but not: n,ecessarily limi(ied to, the follow.ing.,
<br />
<br />-. LandP-os:ition
<br />
<br />· J.\.rea of Di sturban:ce
<br />
<br />· Wat,er S:torag'e Capacity
<br />
<br />· W'ater Resetvolr Fill Requ.irements
<br />
<br />· Maximum Em'ban,kme:nt Height
<br />
<br />· Imp.act from unde-rgrolUl,d works
<br />
<br />· Ease of Permitting
<br />
<br />Ie I Relative ,O'peratio,uar Cost
<br />
<br />3
<br />
|