My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02023
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ02023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:39 AM
Creation date
7/9/2007 1:37:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0044FX
Contractor Name
Larimer County, Board of County Commissioners
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,. ~ <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />~ <br /> <br />Bill Owens <br />Governor <br /> <br />FEASIBILITY STUDY REVIEW MEMO <br /> <br />November 13,2000 <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Dan Mcl~.uliffe <br />CWCB Director <br />(Acting) <br /> <br />Report: Dry Creek Flood Control Plan Feasibility Study <br /> <br />Prepared bv: Larimer County Engineering Dept. and City of Fort Collins Utilities <br />Reviewer: Bill Green /'fl~ <br /> <br />1. The CWCB Guidelines for feasibility studies require that each feasibility report <br />should be a stand-alone document based on the assumption that the reader is not <br />familiar with the study area or the proposed project. The report should include <br />adequate documentation to allow the CWCB staff to present a proposal to the Board <br />with a full explanation of the technical, financial, economic and institutional <br />ramifications of the proposal. Please see Sections 1.0,2.0 and 4.0 as well as <br />Appendices Band C of the Guidelinesfor Financial Assistance. <br /> <br />2. The first 11 pages of the report need a substantial amount of editing and a: lot more <br />documentation regarding the technical aspects of the project. <br /> <br />3. Better maps, figures, diagrams, etc. are needed to show locations of the items <br />described in the text, especially on pages one and two. The map of the entire basin <br />needs some improvement. <br /> <br />4. Shorter paragraphs would make the report much easier to read. <br /> <br />5. The Study Objective should be moved to the first page of the report and clarified in <br />specific terms. What exactly is the report intended to accomplish in terms of the . <br />project need and purpose? In the first sentence "technical" should be included with <br />"economic, institutional and fmancial feasibility". <br /> <br />6. Introduction and Background Information (now on page one) should be reduced and <br />clarified. A brief description of the proposed project and the funding request should <br />be included in this section of the report along with the need for and purpose of the <br />project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.