My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FS0018X Misc. Communications
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
FS0018X Misc. Communications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2014 3:25:49 PM
Creation date
7/9/2007 1:15:37 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0018X
Contractor Name
Sterling, City of
Contract Type
Loan
Water District
0
County
Logan
Loan Projects - Doc Type
Default Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.,- <br />~ <br /> <br /> <br />N <br /> <br />GINEERING, INC 5100 S. Akron street, Suite 300, Englewood, CO BOlle. Phone (303) eel-O~Oe / Fax (303) eel-4019 <br /> <br />1iIi. <br />.. <br /> <br />Planning <br /> <br />a" <br />~ . <br />..---- .. <br />- . <br /> <br />Design <br /> <br />Ii <br /> <br />Management <br /> <br />'. <br /> <br />. <br /> <br />December 14,2001 <br /> <br />Mr. Quentin Bliss <br />URS <br />One Old Mill Building <br />101 South 108th Avenue <br />Omaha, Nebraska 68154 <br /> <br />Re: Pawnee Creek Flood Mitigation Project - City of Sterling, CO <br />EA Information <br /> <br />Dear Mr. Bliss: <br /> <br />This letter and the enclosed documents are provided for your use in preparing the EA for <br />the Pawnee Creek Flood Mitigation Project near the City of Sterling, Colorado. The <br />items listed below correspond to your November 28, 2001 letter, which included a list of <br />information you requested to complete the EA. A copy of your Noyember 28, 2001 letter <br />has also been included for your reference. <br /> <br />1. The footprint of the project has been fmalized and all items that will be impacted <br />by the project have been identified and included on the conceptual layout <br />drawing. Items that have been deleted since the previous conceptual design have <br />been shown on the hard copy of the conceptual design drawing using hand written <br />notes. An electronic copy of the conceptual design drawing is included on the CD <br />with the enclosed package. The deleted items are not shown on the electronic <br />drawing. <br /> <br />2. A copy of the Cultural Resources Survey Report and the transmittal letter used to <br />send the report to SHPO has been included for your use. We have not received a <br />concurrence letter from SHPO at this time. We will forward any information we <br />receive from SHPO to you upon receipt. <br /> <br />3. The channel grading is mostly complete except for some minor adjustments and <br />to include any irrigation ditch modifications. These are minor items and will not <br />affect the earthwork quantity significantly. A current estimate of excess <br />excavated material is 450,000 cubic yards. Some of this material will be used to <br />raise a portion of State Highway 6 as a part of the HWY 6 bridge construction. <br />The City has plans for approximately 75% to 100% of the material to be used on <br />City property near the project. The Colorado Department of Transportation <br />(CDOT) has made a request to use a portion of the material to be used on local <br />State projects. All disposed material will be placed and protected according to the <br />
The URL can be used to link to this page
Your browser does not support the video tag.