My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FS0018X Application
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
FS0018X Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:39 AM
Creation date
7/9/2007 1:15:32 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0018X
Contractor Name
Sterling, City of
Contract Type
Loan
Water District
0
County
Logan
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. ' <br /> <br />. . <br /> <br />CWCB Construction Fund Loan Application <br />Revised January 31, 1994 <br /> <br />4. Is the organization incorporated in the State of Colorado? YES _ NO X <br />(If "YES," please include a copy of the articles of incorporation and the Bylaws <br />with this application form.) <br /> <br />5. Please provide a brief description of the owner's existing water supply facilities <br />and describe any existing operational or maintenance problems. (Attach separate <br />sheets and a map, ifneeded): <br />Not applicable - flood mitigation project. See "Pawnee Creek Flood Hazard <br />Mitigation Feasibility Study", March 2001. <br /> <br />6. <br /> <br />For existing facilities indicate: <br /> <br />(a) the number of shareholders N/A or <br /> <br />11,000 residents <br /> <br />(b) the number of customers serviced N/ A . <br /> <br />Part B - Description ofthe Project <br /> <br />1. <br /> <br />Name ofthe project or facility: <br /> <br />Pawnee Creek Flood Hazard Mitigation <br /> <br />2. What is the purpose ofthis loan application? Check one. <br /> <br />X New project <br /> <br />Rehabilitation or replacement of existing facility <br /> <br />Enlargement of existing facility <br /> <br />Emergency repair <br /> <br />Other (describe) <br /> <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently <br />under a storage restriction order from the State Engineer? YES NO N/A <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.