My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FS0018X Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
FS0018X Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2014 4:12:09 PM
Creation date
7/9/2007 1:15:25 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0018X
Contractor Name
Sterling, City of
Contract Type
Loan
Water District
0
County
Logan
Loan Projects - Doc Type
Approval Letter
Sticky Note
ID:
1
Text:
Project deauthorized by HB04-1221
signed,
Jodie Tavares
Program Assistant
Finance Section
CWCB
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1 31 3 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />STATE OF COLOMDO <br /> <br />. <br /> <br />Bill Owens <br />Governor <br /> <br />February 12, 1999 <br /> <br />Greg E. Walcher <br />Executive Director, DNR <br /> <br />Mr. Randall Gustafson <br />City Manager <br />City of Sterling <br />421 North 4th Street <br />Sterling, Colorado 80751 <br /> <br />Peter H. Evans <br />Acting Director, CWCB <br /> <br />Re: Pawnee Creek Flood Control Project <br /> <br />Dear Mr. Gustafson: <br /> <br />I am writing to confirm that at the January 27, 1999 meeting of the Colorado Water Conservation <br />Board, the Board recommended an increase in the City of Sterling's Construction Fund <br />authorization of$685,000 for the Pawnee Creek Flood Control Project. For this additional <br />increment of funding, the term of the loan is for up to 20 years and the approved lending rate is <br />3.50 percent. <br /> <br />The Board's action on the $685,000 loan request will be included in the 1999 CWCB legislation <br />(SB 99-173) and is subject to authorization by the General Assembly. If authorized by the <br />General Assembly, the total Construction Fund authorization for this project will amount to <br />$1,235,000. <br /> <br />As security for the loan, it-is expected that the City will pledge revenues from that portion of the <br />City's sales tax that is set aside for drainage and flood control purposes as well as funds in the <br />amount of two annual loan payments that the City will deposit to a separate account that the City <br />will assign to the CWCB. Additionally, the City will be required to maintain a debt service <br />reserve fund in the amount of one annual loan payment. <br /> <br />The Board's approval ofthe increase in the City's loan authorization was made subject to the <br />following conditions: <br /> <br />1. prior to entering into a loan contract with the CWCB, the City will hold an election, <br />in compliance with the requirements of Amendment One to obtain voter approval for <br />incurring debt with the CWCB, and <br /> <br />2. the feasibility study for the Pawnee Creek Flood Control Project will be amended to <br />meet the requirements ofthe CWCB Construction Fund Guidelines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.